Laserfiche WebLink
City of Redwood City ~esign-Builder Selection <br /> <br /> EXHIBIT "D" <br /> <br /> REIMBURSABLE PROJECT COSTS (DIRECT COSTS) DEFINITION <br /> <br /> FOR THE <br /> <br /> CITY OF REDWOOD CITY <br /> FIRE STATION NUMBER 11 <br /> <br /> March 1999 <br /> <br />The following reimbursable costs, as required, will be included in the cost of the work by <br />the D-B or the trades performing the work after sub-trade bidding and, as such, shall not <br />be included in the lump sum general conditions. <br /> <br />· City of Redwood City taxes (if any) <br />· Concrete pumping <br />· Consumable construction supplies <br />· Contract crane rental <br />· Equipment rental in connection with direct work incorporated into the work <br />· Exterior scaffolding and plank <br />· Labor to install material incorporated into the work <br />· Materials and equipment incorporated into the work <br />· Payroll taxes, fringes, and other payroll charges normally designated as "labor <br /> burden" on all direct hire labor <br />· Premiums for Labor and Materials and Faithful Performance Bonds if requested by <br /> Owner <br />· Sales taxes on materials and equipment incorporated into the work <br />· Shipping and freight charges on materials incorporated into the work <br />· Subcontracted work <br />· Subcontractor permits <br />· Subcontractors' cleanup of their own work <br />· Subcontractors' PL/PD insurance <br />· Surveying and staking <br />· Winterization and dewatering <br />· Workers' Compensation Insurance <br /> <br />C:~back456~wkgfls~99010~RFP Page 31 of 32 <br />3/09/99 <br /> <br /> <br />