F HK & PEEp S <br /> <br /> Mr. John Wagstaff <br /> May 19, 2003 <br /> Page 2 <br /> <br /> The purpose of this letter is to request a budget amendment to revise our analysis to not <br /> include the Woodside Road widening projeci. The tasks that we propose to undertake are <br /> described below: <br /> <br /> Task l: Revise Background Conditions Analysis. we will revise the levels of service <br /> calculations at the key intersections under Background Conditions to include the <br /> existing lane configurations on Woodside Road. <br /> <br /> Task2: Revise Project Conditions Analysis. We will revise the levels of service <br /> calculations at the key intersecti6ns under Project Conditions to include the <br /> existing lane configurations on W6odside Road. The results of this analysis will <br /> be compared to the results of the revised Background Conditions analysis and <br /> the effects of the proposed pmjecl at these key intersections will be assessed. <br /> Feasible mitigation measures will be identified, if possible, to mitigate project <br /> impacts. <br /> <br />Task $: Revise With Bloraquiat Conditions Analysis. We will revise the levels of service <br /> ca~culalions at the key intersections under Background and Project Conditions <br /> W~rth Blomquist Street to include the existing lane configurations on Woodside <br /> Road. The ef?ects of the proposed project at the key intersections will be <br /> assessed. Feasible initiation measures will be identified, ff possible, to mitigate <br /> project impact& <br /> <br />Task 4: Revise Cumulative No Project Conditions Voturnes. Since the time the <br /> txansportation impact analysis was conducted for the Marina Shores EIR, project <br /> destxipfions, trip generation, and trip asalgnment estimates for several pending <br /> projects in Redwood City have changed. City staff ha~ indicated that the <br /> projected volumes under Cumulative No Project Conditions at the key <br /> intersections should be updated to reflect the more refined assumptions for <br /> pending traffic volumes in the area. Fehr & Peers Associates will revise our <br /> pending project trip assignments and revise the projected volumes at the key <br /> intersections under Cumulative No Project Conditions. <br /> <br />Task 5: Revise Cumulative No Project Conditions Analysis. The revised Cumulative No <br /> Project Conditions volumes and existing lane configurations on Woodside Road <br /> will be used to revise the level of service analysis at the key intersections. <br /> <br />Task 6: Revise Cumulative with Project Conditions Analysis. Traffic from the proposed <br /> project will be added to the Cumulative No Project Conditions volumes and <br /> levels of service calculations will be conducted at the key intersections under <br /> <br /> <br />