My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-05-20
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-05-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:09 PM
Creation date
5/17/2002 8:53:25 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
5/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tom Passanisi <br />Principal Planner <br />Redwood City <br /> <br />Dear. Mr. Passanisi: <br /> <br />Subject: 747 Southview Way project <br /> <br />As a resident of Southveiw Way, I am submitting this letter concerning recent <br />developments and frauduiant representation by Ayoub Farahyar and his architect at the <br />Public Hearing by the Zomng Administrator of March 20, 2002 at 9:00 am, at which I <br />was present. <br /> <br />Tis hearing was required because of the severe slope of the 747 Southview way property. <br />The Zoning Administrator represented that the Lot Line adjustment and the Archactural <br />plan and the water line extension had all been approved; I do not understand this since <br />these require Planning Commission Public hearings and public hearings by the Ci~ <br />Council, which have not yet occurred. <br /> <br />I have been closely following the proposal for Mr Faharyar's project, and I do not wish to <br />impair him from completing his project as long as it conforms to agreed upon guidelines. <br /> <br />1. Some of us had expressed that we are not interested in widening the road beyond the <br /> current road~ay. I would like to reiterate tlmt position by stating here that I am not <br /> interested ha widening the road beyond the current 28' roadway that the Town of <br /> Woodside has proposed as necessary. At the meeting, I stated my position that the <br /> road had a serious bottleneck that needed to be remedied. I have made it clear to Mr. <br /> Farahyar in the past that there is a bottleneck that needed to be fixed before the street <br /> could handle another resident. Mr Farahyar has agreed with residents of Osuthview <br /> Way that there is a bottleneck and that it would be remedied. I have a copy ora <br /> signed letter from Mr. Farahyar to one of the residents of Southview Way which <br /> confirms this agreement. <br /> <br /> At the hearing Mr. 5arahyar ¢laimsd that we ali signed a letter agreeing that the <br /> roadway did not need to be changed. He claimed he had a signed letter from all of the <br /> residents, but could not £md it at the meeting. I have spoken to several of the residents <br /> post-meeting and have been assured that Mr. Farahyar is mistaken or is fraudulently <br /> misrepresenting them. The letter signed by some of the residents will not support Mr. <br /> Farahyar's el;alms. In addition I have a copy ora signed letter from Mr. Farahyar to <br /> another Southview Way resident cord'ming his duplicity,. Mr. Farahyer <br /> misrepresented his position and the development at the Public Hearing. <br /> <br /> The Zoning Admirdstrator did not inquire or seem interested in the bottleneck, in fact <br /> he rushed the meeting thorough this topic. He, in fact had just had a private meeting <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.