My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-05-20
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-05-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:09 PM
Creation date
5/17/2002 8:53:25 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
5/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mass required above the soft bay mud to reach the design food height. It is also possible that the <br /> Geotechnical services required to complete the project may require a stability analysis of the outer levee. <br /> This would require several (3 or 4) borings along the levee to evaluate the thickness and nature of the fill <br /> materials composing the levee and the strength of the Bay Mud immediately below. The cost of stability <br /> analysis will be $6,935. <br /> <br /> We anticipate an additional fee of $31,747 will be required to complete the alternate design. Ifa stability <br /> analysis of the staged levee improvement project is required, an additional $6,935.50 will be required. <br /> <br /> We trust this letter provides the information you require at this time. Please call if you have any questions <br /> or comments. <br /> <br /> Sincerely, <br /> <br /> CCS Planning and Engineering, Inc. <br /> <br /> Odeon 3~ Li, P.E. <br /> Project Manager <br /> <br />P \01092LAdmin\Correspondence\Letlers\00].RWGscope |~es - 042902 doc <br /> 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.