Laserfiche WebLink
mass required above the soft bay mud to reach the design food height. It is also possible that the <br /> Geotechnical services required to complete the project may require a stability analysis of the outer levee. <br /> This would require several (3 or 4) borings along the levee to evaluate the thickness and nature of the fill <br /> materials composing the levee and the strength of the Bay Mud immediately below. The cost of stability <br /> analysis will be $6,935. <br /> <br /> We anticipate an additional fee of $31,747 will be required to complete the alternate design. Ifa stability <br /> analysis of the staged levee improvement project is required, an additional $6,935.50 will be required. <br /> <br /> We trust this letter provides the information you require at this time. Please call if you have any questions <br /> or comments. <br /> <br /> Sincerely, <br /> <br /> CCS Planning and Engineering, Inc. <br /> <br /> Odeon 3~ Li, P.E. <br /> Project Manager <br /> <br />P \01092LAdmin\Correspondence\Letlers\00].RWGscope |~es - 042902 doc <br /> 2 <br /> <br /> <br />