My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-03-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:53:55 PM
Creation date
3/10/2005 4:10:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
3/14/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�.1.�-�-� <br /> The demolition of the South Annex must be underway prior to this summer (2005), to <br /> avoid any conflicts with the Plaza and Streetscape (Broadway) re-construction. <br /> The "Final Agreed Price" is based on an estimate prepared by DPR. No bids have been <br /> received at this time. When all bids are received by the subcontractors, and the total of <br /> all bids is less than or equal to the estimate, no further action is necessary. <br /> Alternative <br /> . Council can elect to not enter into this Agreement with DPR, and begin a new process to <br /> select a CM/GC and/or contractor with the capabilities of constructing the Historical <br /> Courthouse Reconstruction and Courthouse Plaza. <br /> Fiscal Impacts <br /> The Final Agreed Price to demolish the existing Annex and reconstruct the Courthouse is <br /> $4,955,057.00, as shown in Exhibit "C" to the Agreement. The estimate breakdown is as <br /> follows: <br /> Descri tion Amount <br /> Construction Costs $3,598,637.00 <br /> General Conditions 739,029.00 <br /> Overhead & Profit 4% 180,085.00 <br /> Insurance, Contingencies, Permits, 272,856.00 <br /> Bid Packa e Bu out <br /> ADD ALTERNATE S <br /> Salva e, Window Re air, <br /> Li htin & Controls 164 450.00 <br /> TOTAL $4,955,057.00 <br /> fn January of 2003, when the budget was first established, the original Redevelopment <br /> Budget for the project was $4,303,284.60 (including add alternates), based on original <br /> estimates. The difference in the estimates is the result of inflation and increase in cost <br /> of raw materials. <br /> Funds in the amount of $4,955,844.00 are remaining in � Redevelopment Capital <br /> Outlay Budget f�r this project. <br /> � � ., <br /> Pau illis e Patters <br /> As �iate Engineer mmu ' D o rS�ent S ices Director <br /> � <br /> � � � - <br /> � Susan Moeller Ed Evere <br /> Redevelopment, Housing, City Manager <br /> Economic Development Manager <br /> PW/BL:ss <br /> S/library/reports/paul/consultant DPR_HCR Project <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.