Laserfiche WebLink
modification west of El Camino Real must be installed simultaneously with the easterly <br /> segment; the two eastbound lanes approaching the intersection will be changed, from <br /> the existing availability of both lanes for through traffic, to one right only and one shared <br /> left/through lane. This is necessary since only one eastbound lane will be available east <br /> of El Camino Real. <br /> <br /> Since this is a test and no improvements are to be made, except paint and signs, <br /> modifications to improve safety or traffic handling can be made quickly to minimize any <br /> problems. <br /> <br /> On May 7, 2002, this Plan was presented and endorsed by the Redwood City <br /> Downtown Business Group. A letter also went out to all property owners and tenants on <br /> the 2600 and 2700 blocks of Broadway, asking for comments. All of the people <br /> responding to the letter were in favor of the change, and represent slightly more than <br /> 50% of the 2600 block street frontage. The Plan has also been endorsed by those <br /> people participating in the forums held by "Project for Public Spaces" (Fred Kent). <br /> <br /> Alternatives <br /> 1. Do not reconfigure traffic and parking lanes as proposed. Broadway will remain as <br /> is. <br /> <br /> 2. Reconfigure traffic and parking lanes on only a portion of the subject segment. <br /> <br /> 3. Direct staff to prepare a revised Plan incorporating Council direction. <br /> <br /> Fiscal Impact <br /> Total cost for the project is estimated at $20,000. Improvements will be installed <br />.~.. primarily by the City's Public Works Services Department, with Contractor assistance for <br /> some specialized tasks. <br /> <br /> Funds in the amount of $79, 195.35 are currently available for this project in the Traffic <br /> Calming Program of the 2001-2002 Capital Improvement Program Budget, as part of <br /> the Gas Tax Construction Fund. <br /> <br /> ineering & Construction City Manager <br /> S/library/reports/richard/broadway lane reconfiguration <br /> <br /> <br />