My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-06-03
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:12 PM
Creation date
5/31/2002 9:02:34 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
6/3/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B-1 <br /> SCHEDULE OF FEES - 2002 <br /> <br /> PERSONNEL <br /> Supervisory Engineer .......................................................................................... 105.00-I35.00/hr <br /> Senior Engineer .......................................................................................... 95.00-120.00/hr <br /> Supervisory Biologist ......................................................................................... 85.00-110.00/hr <br /> Senior Fisheries Biologist ............................................................................ 80.00-105.00~hr <br /> Staff Engineer or Biologist ............................................................................ 65.00-75 bO/hr <br /> Supervisory Pest Control Operator ........................................................................ 55.00-70.00/hr <br /> StaffPest Control Operator ............................................................................ 35.00-45.00/hr <br /> Senior Technician ......................................................................................... 50.00-60.00/hr <br /> Staff Technician <br /> ......................................................................................... 30.00-45.00/hr <br /> Technical or Office Assistant <br /> ............................................................................ 25.00-35.00/hr <br /> Draftsman or CAD Draftsman (equipment included) .................................................... 60.00-80.00/hr <br /> Principal - Special Consultation ............................................................................ 150.00/hr <br /> PROFESSIONAL SERVICES <br /> Lagoon Suerveys .......................................................................................... 85.00/hr <br /> (Includes Boat with motor, Senior Technician or pest Control Operator) <br /> Travel time and launch fee ............................................................................ 30.00/hr <br /> Harvester <br /> ................................... ; ...................................................... 150.00/hr <br /> (Includes one Senior Technician, one Staff Technician, conveyor trailer, <br /> vehicle to tow trailer and fuel <br /> <br /> Transport Fee ......................................................................................... 200.00/hr <br /> (Charged for the first day of a harvesting cycle) <br /> Launch Fee <br /> Concrete ramp provided ............................................................................ No Charge <br /> Tilt Trailer used to launch and retrieve ........................................................................ 250.00 <br /> Crane used to launch and retrieve ............................................................................ Cost + 15% <br /> Vegetation Disposal <br /> Within one mile, each way, of the launch site ............ , ................................................... INC <br /> Any distance over one mile each way ........................................................................ 2.50/mile <br /> If needed to be loaded in dumpsters, per man ................................................................ 25.00/hr <br /> <br /> Chemical Application of Aigaeeide EarthTee .................................................... 55.00/gal <br /> (Includes chemicals, boat with motor, spray equipment, Chemical <br /> Applicator and Staff Technician) <br /> Chemical Application of Herbicide REWARD ................. ; ..................... 175.00/gal <br /> (Includes chemicals, boat with motor, spray equipment, Chemical <br /> Applicator and StaffTechnician) <br /> <br /> MISCELLANEOUS <br /> Requested Overtime: 125% of Regular Rates <br /> Outside Services / Rentals / Permits / Job Materials: Cost + 15% <br /> Expert Testimony and Courtroom, Deposition or Hearing Attendance: 150% of Regular Rates <br /> <br />January 1, 2002 - February 28, 2003 Waterworks Industries, Inc <br /> AGMT-272 Task Order No 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.