My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-06-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-06-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:15 PM
Creation date
6/7/2002 9:48:07 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
6/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Staff is administering the program following performance measure criteria to not remove <br />more than 20% of the larger trees on a street or more than two trees in a row. Staff <br />encourages property owners to preserve trees by allowing the City to establish a sidewalk <br />maintenance easement on private property for the relocation of the sidewalk. Failure to <br />provide the easement may cause the site to be skipped to avoid tree removal. The City <br />will bypass permanent sidewalk repairs if the property owner does not want to provide an <br />easement in order to retain a tree. A temporary asphalt repair will be made to alleviate the <br />defect and reduce the risk at the site. <br /> <br />Property owners are also offered the opportunity to participate in cost shared repairs for <br />defects of less than one-inch and may pay 100% of the repair cost for replacement of <br />undamaged concrete. <br /> <br />Based on the Iow bid, if the contractor proves to work in an effective manner, staff will be <br />coming back to Council for a change order for additional work for approximately $100,000, <br />since the awarded bid is lower than the Engineer's Estimate by almost $90,000 and the <br />budget is available. <br /> <br />Alternatives <br />1) Award the contract to a higher bidder <br />2) Not award the contract <br />3) Re-bid the contract <br /> <br />Fiscal Impact <br />Funds have been approved in the FY 2001-2002 Capital Improvement Program, Tree <br />Preservation and Sidewalk Repair funding in the amount of $1~000,000. The budget <br />contains the following balance: <br /> <br />· Current project balance $ 663,942 <br />· 2001-2002 Tree Preservation and <br />Sidewalk Repair Program (subject project) -$ 537,143 <br />· Planned project change order based on Iow bid -$ 100,000 <br />· Project administration and inspection (FY 01-02) -$ 10,000 <br /> CIP balance at en'~of FY 01-02 $ 16,799 <br /> <br />, "~_____~ <br />Gordon Mann Peter Ingr~m Ed Eve~'ett" <br />Public Works Superintendent Public Works Sen/ices Director City Manager <br /> <br />Attachments <br />None <br /> <br /> Page 2 of 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.