Laserfiche WebLink
<br />EXHIBIT A <br /> <br />PROJECT SCOPE OF SERVICES <br /> <br />FOR <br /> <br />CITY OF REDWOOD CITY <br /> <br />REDWOOD CITY SCHOOL RENOVATIONS PROJECT <br /> <br />PROJECT UNDERSTANDING I HISTORY: <br />The City of Redwood City is proposing to retain the firm of the beals group, inc., to provide <br />landscape architectural, civil engineering, and construction administration services for the <br />renovation of fields at Taft and Garfield Elementary Schools. The Redwood City School <br />Renovation Project arises from the City's Request for Proposals dated November 13, 1998. At <br />present the turf play areas have inadequate drainage and unsafe play conditions. The <br />preliminary construction budget and basis for the following scope is $655,000 for Taft and <br />$980,000 for Garfield Elementary Schools, including contingencies for design modifications <br />and construction, but excluding design fees. <br /> <br />GENERAL PROJECT SCOPE: <br />The project scope herein provided will be broken into five general phases: <br /> <br />1. <br /> <br />The first will be Project Start-up and Pre-planning Phase, in which we will meet <br />with City Staff and begin reviewing all information pertinent to the project. <br />Existing Conditions bases will be generated by the beals group, inc., for the <br />Analysis and Design Phase. <br />The second phase will be an Analysis and Design Phase, in which we will <br />prepare final design boards for approval through public process. A series of <br />public workshops in conjunction with meeting with City staff will enable the <br />beals group, inc., to develop Preliminary Concept Plans, Final Schematic <br />Plans, and the final design boards, which will be submitted for public approval. <br />Budget analysis will also be provided during this phase. <br />The third will be a Design Development Phase, in which we will develop a finite <br />design of civil engineering, landscaping, and play area plans that will be used as <br />the basis for the construction documents. <br />The fourth phase will be the Construction Documents, which includes a 70%, <br />90%, 100%, and Bid submittal. The end product will be construction documents <br />with plans, specifications and statement of probable construction costs. <br />The final phase will be the Construction Services which will include extensive <br />bid and construction support and construction administration services. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />J:\Proposals\P99IP99-06 RWCny School RenovationsIP-Scope-4-16-99 .doc <br /> <br />1 <br />