Laserfiche WebLink
<br />Depending on the preferences of the Lead Agency, MTCo will summarize important <br />findings and recommendations of the Addendum, or will simply answer questions. <br /> <br />Final Environmental Document. Following closure of the comment period and the public <br />hearings (if held), MTCo will prepare a preliminary final Addendum that includes responses <br />to comments. The Lead Agency and Caltrans will review the preliminary draft Addendum <br />prior to preparing a final Addendum. Approximately 60 copies of the Final Addendum will <br />be produced. City council's action to accept and adopt the addendum would complete the <br />environmental process for CEQA. For federal requirements, MTCo will prepare CAT-X, <br />monitor and assist City in securing FHW A's approval for the CAT-X <br /> <br />3.12 PSR/PR. Prepare a draft combined PSR/PR for the subject interchange following Caltrans <br />guidelines. Identify and prepare all design exceptions required. <br /> <br />Submit 30 copies of the draft PSRlPR to Caltrans for review and comments. If second <br />submittal is required, Consultant shall resubmit additional 30 copies to Caltrans for second <br />review and circulation. <br /> <br />Prepare and process all design exception fact sheets for Caltrans' approval. <br />Incorporate Caltrans comments and produce 50 copies of the final PSRlPR. <br /> <br />Assist the City with the filing of approval with FHW A for CAT-X <br /> <br />3.13 Aerially Deposited Lead Testing Report. Prepare aerially deposited lead testing report <br />based on 30 field samples in conformance with Caltrans general practices for the <br />determination of aerially deposited lead locations. <br /> <br />Deliverables: 5 copies of report <br /> <br />Task 4 - Detailed Project Design <br /> <br />Task Description. This task includes right-of-way engineering and the preparation of the <br />PS&E. <br /> <br />The PS&E package shall be submitted at 35%, 65%, 95%, and 100% stages of completion, <br />including assisting the City during the bidding period. <br /> <br />The intent of intermediate submittals is to define the project for review by the City and Caltrans <br />staff, and to allow for major comments prior to the investment of significant design effort in <br />design details. The approach will be to develop a skeleton plan set, based on the Geometric <br />Approval Drawings, and build upon the set by adding plan information and additional detail <br />sheets until a complete, buildable, and biddable package is reached. <br /> <br />The PS&E will be prepared to Caltrans format. <br />The following plan sheets will comprise the final plan package: <br /> <br />Exhibit "A" <br />Route IOI/Ralston-Marine Parkway Interchange Project <br />Scope of Services <br /> <br />Page 11 <br /> <br />, '-""'""""""--"""""'-"--""-".-' <br />