My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 City of Belmont
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 City of Belmont
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:52 PM
Creation date
4/19/2005 11:50:18 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Belmont
PROJECT NAME
cost sharing agreement
RMP File Number
304
Date
4/6/1999
Reso Ref
13581
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />40 sets of project specifications <br />35% review comments (City and Caltrans) <br /> <br />95% Submittal. This submittal represents complete checked plans, ready for bidding. <br />This submittal phase is for Caltrans to perform final check, generally done by the Project <br />Development staff level. <br /> <br />Deliverables: 10 blueline sets (full size) and 20 Yz size sets of full PS&E <br />65% review comments (City and Caltrans) <br /> <br />100% Submittal. This submittal represents complete checked plans and submittal of the <br />original drawings, ready for bidding, with changes as requested in the 95% review. <br /> <br />Prepare Resident Engineer's File (separate file to DOS for bridge related items). File will <br />include a list of project contacts, memos to the Resident Engineer, quantity calculations for <br />use in releasing progress payments, utility agreements, permits, right-of-way contracts, and <br />copies of relevant reports. <br /> <br />Prepare Surveyor's File including slope staking data, rough grading data, finish grading <br />data, and bridge construction control data. Prepare cutsheets as required. Include control <br />line traverses and ties to right-of-way lines. <br /> <br />Prepare permit application for construction. <br /> <br />Deliverables for Final PS&E: <br /> <br />Permit application <br />30 bluelines of final plans and specifications (complete set) <br />20 sets of Yz size plans <br />2 copies of Resident Engineer's File <br />2 copies of Surveyor's File <br />95% review comments <br /> <br />4.13 Bidding Phase. Advertising and bidding procedures will be the responsibility of the City. <br /> <br />The Consultant shall assist the City during the bidding period as required. While the <br />project is being advertised for bids, all questions concerning the intent shall be referred to <br />the City Project Engineer for resolution. The Consultant shall provide consultation with <br />City staff in the interpretation of the contract documents. The interpretation of these items <br />shall be analyzed for a decision by the City, as to the proper procedure required. <br />Corrective action shall either be in the form of an addendum prepared by the Consultant <br />and issued by the City, or by a covering change order after the award of the construction <br />contract. <br /> <br />Exhibit "A" <br />Route JOJ/Ralston-Marine Parkway Interchange Project <br />Scope of Services <br /> <br />Page J6 <br /> <br />" --"'..'..'.._,--'_'_,_000__"__--" <br />
The URL can be used to link to this page
Your browser does not support the video tag.