Laserfiche WebLink
<br />EXHIBIT "A" <br /> <br />Scope of Work <br /> <br />General Description of Work <br />This scope of work shall provide for obtaining final concept approval and preparing construction <br />bid documents including plans, technical specifications, general and special provisions, and <br />estimates for the STREET SYSTEM IMPROVEMENTS as outlined in the Shores Transportation <br />Improvement District (STID) supplement to the Final Report dated June 10, 1998 and for work <br />added subsequent to the supplement to the final report. <br /> <br />The Project is generally defined as the construction of intersection improvements at 4 locations in <br />the Shores Area, including new signal installations, signal modifications and the addition of turn <br />lanes. All work will be administered under the contract with STID, however the Bid Documents <br />(PS&E) will be developed per the requirements and under the oversight of Redwood City. The <br />supplement to the final report identified the following mitigation measures at Locations 2,3, and <br />6. Location A was added subsequent to the supplement to the final report. <br /> <br />Location 2 - Intersection of Marine Parkway and Twin Dolphin Drive <br />. Provide an additional eastbound exclusive right turn lane on Marine Parkway <br /> <br />. Modify existing traffic signal <br /> <br />Location 3 - Intersection of Marine Parkway and Bridge Parkway <br />. Provide an additional eastbound and westbound exclusive left turn lane on Marine Parkway <br /> <br />. Modify existing traffic signal <br /> <br />Location 6 - Intersection of Bridge Parkway and Redwood Shores Parkway <br />. Provide an additional northbound exclusive left turn lane on Redwood Shores Parkway <br /> <br />. Provide an additional eastbound exclusive right turn lane on Bridge Parkway <br /> <br />. Provide an additional westbound exclusive left turn lane on Bridge Parkway <br /> <br />. Install a new traffic signal <br /> <br />Location A - Marine Parkway Widening (Twin Dolphin Drive to Oracle Parkway East) <br />. Provide a second left turn lane from Marine Parkway into Oracle Parkway <br /> <br />. The design for this work was previously prepared by others (Brian Kangas Foulk), and it will <br />be included in this Construction Package as an insert or attachment <br /> <br />Included in this Final Design shall be: <br /> <br />. <br /> <br />The Consultant shall prepare the improvement plans per the STID Final Report prepared for <br />the Cities of Belmont, Redwood City, and San Carlos that identified the necessary intersection <br />construction improvements. The improvements and contract bid documents to be prepared <br />by the Consultant shall correspond to the identified work as outlined above. <br /> <br />Proposal- City of Redwood City (April 26, 1999) <br /> <br />Shores Area Street System Improvements <br />Page 1 <br /> <br />M:\O16.99\Proposa~PRP _1V6WPD <br /> <br />- ,-,."""..", .-.....-......-. . <br />