My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 CCS Planning & Engineeri
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 CCS Planning & Engineeri
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:20 PM
Creation date
4/19/2005 11:54:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CCS Planning & Engineering
PROJECT NAME
Redwood Shores traffic improvements
RMP File Number
304
Date
7/19/1999
Reso Ref
13614
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />The Consultant shall perform coordination with the City, the County, utility companies, <br />regulatory agencies, and with others as required. <br /> <br />The Consultant shall perform design field surveys to establish project controls (horizontal and <br />vertical) and provide aerial topographic mapping. <br /> <br />The Consultant shall provide a Geotechnical Report for pavement design and foundation <br />recommendations for traffic signal poles. <br /> <br />The Consultant shall design City or County owned utility relocations, including storm drain, <br />sanitary sewers, and water lines. <br /> <br />The Consultant shall review privately owned utility plans/relocations as they relate to this <br />project and will draft this utility information on the project's utility drawings. <br /> <br />The Consultant shall prepare roadway signing and striping plans. <br /> <br />The Consultant shall include traffic signal system modifications and intersection lighting for the <br />intersection improvements as outlined above. <br /> <br />Landscaping revisions (limited primarily to planting and irrigation) will be provided within the <br />project limits. <br /> <br />Signal timing sheets. <br /> <br />The Consultant shall include pot-holing of existing utilities as required. <br /> <br />The Consultant shall package design prepared by others into this Construction Package. <br /> <br />The Consultant shall prepare a set of technical specifications and conditions for all work <br />included in the Construction Package. <br /> <br />Submittals at 65%,90%, and 100% (Final). <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Proposal- City of Redwood City (April 26, 1999) <br /> <br />Shores Area Street System Improvements <br />Page 2 <br /> <br />M:\O16-99\Proposa~PRP _1V6WPO <br /> <br />"",.0""',_--"""""'-'" ........".." -.....-.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.