My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 CCS Planning & Engineeri
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 CCS Planning & Engineeri
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:20 PM
Creation date
4/19/2005 11:54:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CCS Planning & Engineering
PROJECT NAME
Redwood Shores traffic improvements
RMP File Number
304
Date
7/19/1999
Reso Ref
13614
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Work Not Included in this Scope of Work <br /> <br />. <br /> <br />Revisions or modifications to the plans developed by others (Brian Kangas Foulk) <br /> <br />Design of interchange improvements for Highway 101 at Ralston Avenue/Marine Parkway and <br />Highway 101 at Holly Street/Redwood Shores Parkway <br /> <br />Design of auxiliary lane improvements on Highway 101 between Ralston Avenue/Marine <br />Parkway and Holly Street/Redwood Shores Parkway <br /> <br />Design of Marine Parkway and Oracle Parkway Grade Separation <br /> <br />Design of improvements at Location 1 (Intersection of Marine Parkway and Oracle <br />Parkway/Shoreway Road) <br /> <br />System wide hydraulic studies <br /> <br />Engineering or design of privately owned utilities <br /> <br />Application fees for permits or fees of any kind <br /> <br />Traffic counts, analyses, or studies <br /> <br />Construction inspection services <br /> <br />Construction surveys or staking <br /> <br />Right-of-way engineering including but not limited to, preparation of plats and legal <br />descriptions, appraisals, negotiations, or acquisitions <br /> <br />Preparation of the Storm Water Pollution Prevention Plan (SWPPP) <br /> <br />Record of Survey <br /> <br />Design of signal interconnect systems <br /> <br />Pavement overlay design or Dynaflect Testing <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Specific Description of Work <br /> <br />Task 1 Project Management and Coordination <br /> <br />1.1 Project Managemen1/Meetings. Project management responsibilities and activities will <br />include the following: <br /> <br />. <br /> <br />Clarify tasks and deliverables <br />Administer the project <br />Prepare progress schedules and status reports detailing progress <br />Ensure conformance with City standards and requirements <br />Coordinate with representatives of City, County, other affected agencies, and utility <br />companies <br />Attend design coordination meetings with adjacent property owners and other <br />consultants during design on adjacent roadway segments <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Proposa/- City of Redwood City (April 26, 1999) <br /> <br />Shores Area Street System Improvements <br />Page 3 <br /> <br />M\O16-99\Proposa~PRP _1V6'wPD <br />
The URL can be used to link to this page
Your browser does not support the video tag.