Laserfiche WebLink
H~. Charles csisc~an <br /> September 7, 1988 <br /> pg. 2 of 2 <br /> <br /> Our fee proposal assumes the creation of a total of 150 plates, <br /> which will consist.of a combination of CADD drafted <br /> construction details, design policy guidelines (produced via Word <br /> processor), CADD generated charts, , a comprehensive table of <br /> contents and a cover. KCA Engineers will supply camera-ready <br /> originals for multiple-copy reproduction by the city. <br /> <br /> Our lump sum fee for the above work shall be 545.000.00 <br /> <br /> The project will be completed incrementally, with the most used <br /> standards and policies worked on first. We expect that the <br /> maximum rate of production will be 10 plates a week. Our quoted <br /> price is predicated on the City authorizing 30 plates at a time. <br /> We propose that both the City and KCA Engineers have-uR~,=icted <br /> use of the electronic standard drawing and design policy database <br /> with the exception that use by KCA will require the elimination <br /> of visual information identifing the plates as Redwood City <br /> documents. <br /> <br /> Please feel free to contact me or Ray Towne at 546-7111 if we <br /> can provide any additional information. <br /> <br /> Very truly yours, <br /> <br /> KCA ENGINEERS, INC. <br />~Fred W. DeJarlais Vice President <br /> <br /> cc: John Lynch, City of Redwood City <br /> <br /> File: StdDrwl <br /> (bc: BB, PJB, Acctig) <br /> <br /> <br />