My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res05 14639
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2005
>
Res05 14639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2011 1:07:26 PM
Creation date
4/26/2005 10:40:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
4/25/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />FINDINGS, RECOMMENDATIONS, MITIGATION MEASURES AND <br />MONITORING EFFORTS ON THE COURTHOUSE FACADE <br />RECONSTRUCTION AND PLAZA PROJECT EIR <br />Under the Project, as defined in the FEIR as the "Preferred Alternative" ( #3), <br />reconstruction of the Historic Courthouse and development of Courthouse Plaza would <br />cause no significant unmitigatable impacts or potential impacts other than in the <br />"Cultural Resources" category. As provided for in the CEQA guidelines, the City used <br />an initial study to help focus the FEIR on the Project's significant environmental impacts. <br />The impacts that were identified as insignificant did not require further review and were <br />therefore not addressed. The FEIR constitutes a focused EIR on Cultural Resources <br />impacts, as supported by evidence in the record. <br />Along with providing findings relating to the Project's environmental impacts, this <br />exhibit details mitigation monitoring and reporting efforts for the Project. At this time, <br />certain mitigation measures listed below have already been addressed and the Project <br />plans and construction documents revised accordingly. The implementation of the <br />mitigation efforts will be monitored and recorded by Redwood City Planning staff ( "staff') <br />during Project development. Once the Project is completed, staff will prepare a <br />mitigation and monitoring report for the Redwood City Planning Commission <br />documenting the status of each mitigation measure and, if applicable, explain any <br />variances therefrom. <br />CULTURAL RESOURCES: <br />A) Demolition of South Annex <br />Potential Impact: Project plans will require the demolition of the South Annex <br />and cause a significant unmitigatable impact to a historical resource, as defined in <br />CEQA Guidelines §15064.5 <br />Mitigation: Demolition of the South Annex will cause a significant impact for <br />which there is no mitigation. In addition, because both the South Annex demolition and <br />Courthouse reconstruction project involve documented historic resources, these two <br />portions of the Project are subject to the Standards. In order to comply with the <br />Standards, specific recommendations which are prescribed for the South Annex in <br />Appendix D of the FEIR must be followed and be implemented as part of the Project. <br />These include the accurate recordation and documentation of certain elements like the <br />upper South Annex friezes and the preservation of certain artifacts prior to demolition. <br />Although these mitigation measures would not reduce the cultural impacts to a less - <br />than- significant levels, these measures will reduce the severity of the impacts by <br />conforming to the Standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.