My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res05 14639
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2005
>
Res05 14639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2011 1:07:26 PM
Creation date
4/26/2005 10:40:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
4/25/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/25/2005 <br />identified in light fixture catalogs and is presently available. Staff will coordinate the <br />needed adjustment and will monitor the installation of these light fixtures. <br />Finding: The mitigation measure is feasible and would reduce the impacts of the <br />Project to less- than - significant levels because the measure would conform to the <br />Standards relating to the treatment of such historic resources. <br />C) Handrail <br />Potential Impact: The Plans, page A3.7, note 12, references a new metal <br />handrail for the portico steps to meet criteria set forth in the Americans with Disabilities <br />Act ( "ADA"). The handrail is based on historic photographs but deviates where the rail <br />meets the column, which is incompatible with the Standards. The Plans show the <br />incorporation of a handrail whose design deviates from the original design and which <br />does not conform to the Standards. <br />Mitigation: The following mitigation measure, as set forth in the FEIR, is hereby <br />adopted and will be implemented as provided in the mitigation monitoring and reporting <br />effort: <br />Review ADA compliance in the State Historical Building Code chapter 8.6 <br />"Alternative Accessibility Provisions" and modify the Plans accordingly in <br />order to conform to the Standards. <br />Monitoring: Prior to City Council consideration of the Project, the Plans were <br />modified to conform to the Standards. Staff will coordinate the needed modifications and <br />will monitor the installation of the handrail. <br />Finding: The mitigation measure is feasible and would reduce the impacts of the <br />Project to less- than - significant levels because the measure would conform to the <br />Standards relating to the treatment of such historic resources. <br />D) Guardrail <br />Potential Impact: The Plans, page A3.7, note 16, references new guardrails (at <br />portico) to meet ADA criteria. The guardrails' ornamental design duplicates the interior <br />guardrail design. This is considered a conjectural feature which is incompatible with the <br />Standards because 1) the design is too close to the design of an historic feature that <br />was not original to the portico, and 2) an interior feature is being duplicated for an <br />exterior feature. <br />Mitigation: The following mitigation measure, as set forth in the FEIR, is hereby <br />adopted and will be implemented as provided in the mitigation monitoring and reporting <br />effort: <br />Atty /Reso /Reso.1530 14639 <br />042005 3 Muff # 301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.