My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 FTB - Freedman Tung & Bo
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 FTB - Freedman Tung & Bo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2006 4:04:03 PM
Creation date
5/4/2005 11:17:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
FTB - Freedman Tung & Bottomley
PROJECT NAME
Courthouse Plaza Design
RMP File Number
304
Date
4/27/2005
MO Ref
05-72 RD-05-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C j Y [ L <br /> <br />> >.' <br /> <br />R S . <br /> <br />P [A .': ¡, S . L :, '" <br /> <br />i'YEYe'" <br /> <br />[) S C ., F ¡'. A" <br /> <br />[TEe <br /> <br /> <br />15 Third Street <br />Santa Rosa, CA 95401 <br />Tel: 7°7 542 6451 <br />Fax: 7°7 542 5212 <br /> <br />April 19,2005 <br /> <br />Mr. Trent Greenan <br />FREEDMAN TUNG & BOTTOMLEY <br />74 New Montgomery Street, Suite 300 <br />San Francisco, CA 94105 <br /> <br />SUBJECT: <br /> <br />Redwood City Courthouse Plaza <br />Revised Proposal <br /> <br />Dear Trent: <br /> <br />The proposed fees for Carlile. Macy services for the Redwood City Courthouse Plaza shall <br />be as follows: <br /> <br />Civil Engineering <br /> <br />. <br /> <br />Coordination of detailed plaza grading with all design elements and Title 24 <br />requirements. <br /> <br />. <br /> <br />Location of drainage structures so as not to conflict with plaza design elements. <br /> <br />. <br /> <br />Potential requirements for sub drainage systems to manage potential ground water <br />problems at new specimen palms surrounding the site. <br /> <br />. <br /> <br />Connection of sanitary sewers to pavilion structures and water feature overflow drains, <br />filter backwashes, and sump pumps. <br /> <br />. <br /> <br />Street frontage improvements at Middlefield and Jefferson to confonn to plaza design <br />and existing new street interface at Broadway. <br /> <br />Civil Engineering Fee: $62,604 <br />(Includes reimbursables budget of $3,544) <br /> <br />Hydromechanical Design <br /> <br />. <br /> <br />Schematic and design development with FTB, SFE, Zeiger Engineers and project <br />architect. Close collaboration with all team members will be required to ensure a <br />functional and maintainable water element. Items of particular concern include: <br />> Wind factors <br />> Water containment <br />> Preliminary vault locations in relation to site elements <br /> <br />T <br />
The URL can be used to link to this page
Your browser does not support the video tag.