Laserfiche WebLink
<br />Mr. Trent Greenan <br />FREEDMAN TUNG & BOTTOMLEY <br />April 19,2005 <br />Page 2 <br /> <br />. <br /> <br />> <br />> <br />> <br /> <br />Lighting design <br />Coping design <br />Waterproofing <br /> <br />Design development phase & CD phases <br /> <br />> <br />> <br /> <br />Water feature design vs. project budget - value engineering phase. <br />Fountain detailing in collaboration with the architectural consultant to ensure water <br />elements are not in conflict with architectural elements. <br />Final coordination of the proposed mechanical system vaults and boxes with the <br />plaza design and service requirements of the City of Redwood City. <br />Interaction with electrical engineer to provide electrical services for pumps and <br />underwater lighting features. <br /> <br />> <br /> <br />> <br /> <br />Hydromechanical Fee: $58,168 <br />(Includes reimbursables budget of $3,293) <br /> <br />The proposed design for the courthouse plaza will require a thoughtful collaboration <br />between all of the design consultants to ensure a successful implementation of the design. <br />Weare committed to helping FTB with the detailed design to provide a fully functional <br />plaza and water feature from both a civil engineering and hydromechanical standpoint. <br /> <br />Very truly yours, <br /> <br />CARLILE. MACY <br /> <br />Ron Hodges <br /> <br />REH:bc <br />PR110401lGC/REH Greenan ¡tr 041905 <br /> <br />- """"""--""'.""-""""".'.---"'-,"--""-""'-"'--""'" <br />