My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 FTB - Freedman Tung & Bo
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 FTB - Freedman Tung & Bo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2006 4:04:03 PM
Creation date
5/4/2005 11:17:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
FTB - Freedman Tung & Bottomley
PROJECT NAME
Courthouse Plaza Design
RMP File Number
304
Date
4/27/2005
MO Ref
05-72 RD-05-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />h <br /> <br /> <br />lighting design <br /> <br />11 March 2005 <br /> <br />Mr, Trent Greenan <br />Freeman Tung & Bottomley <br />74 New Montgomery Street, Suite 300 <br />San Francisco, California 94105 <br />415,291.9455 phone <br />415,291,9633 fax <br />trent@ftburbandesign.com <br /> <br />Re: <br /> <br />Redwood City Courthouse Plaza, Pavilions and Facades <br />Redwood City, California <br /> <br />Dear Mr. Greenan, <br /> <br />We are pleased to submit this revised Proposal for Professional Services as lighting designers for the above project. <br /> <br />The Proposal is based on the scope of services included in the Request for Proposal dated 16 November 2004, our telephone <br />conversation with you on 13 December 2004, and our conversations on 15 February 2005, 9 March 2005 and 11 March 2005, <br /> <br />Scope of Work <br /> <br />The Proposal covers the following areas: <br /> <br />. <br /> <br />Plaza <br />Pavilions (2) <br />Water Features <br /> <br />. <br /> <br />Review of Dome and Portico Lighting <br />South, East and West Facades <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Scope of Services <br /> <br />The following services are included in the fee and are divided into Phases i, II, III and IV, <br /> <br />Phase I (Design Development) <br /> <br />1.1 investigative site visit to document existing conditions related to the exterior site lighting (time for one (1) visit to the project site <br />by a Principal of the firm and/or Project Director is included in the fee), <br /> <br />1.2 Teleconference with the Redwood City Courthouse Lighting Designer (time for (1) one conference call with a Principal of the <br />firm or Project Director is included in the fee), <br /> <br />1.3 Review of Dome Lighting and Portico lighting previously documented by the Redwood City Courthouse Lighting Designer. <br />Review will include preparation of written comments regarding recommended sources and wattages to provide consistency <br />and integration of Dome, Portico, Façade and Plaza lighting systems, <br /> <br />1.4 Conceptual design conference in San Francisco with Architect, Landscape Architect and other Consultants to discuss lighting <br />program, illumination criteria, project cost guidelines and schedule parameters (time for two (2) meetings attended by a <br />Principal of the firm or the Project Director is included in the fee). <br /> <br />SF ILA I NY I 300 Brannan Street Suite 212 San Francisco CA 94107 415 348 8273 voice 415 348 8298 fax I www.HLBLighting.com <br /> <br />... ..,-_..__.. """""""""-"""-"""'-"-'--.--"""---'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.