My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 FTB - Freedman Tung & Bo
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 FTB - Freedman Tung & Bo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2006 4:04:03 PM
Creation date
5/4/2005 11:17:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
FTB - Freedman Tung & Bottomley
PROJECT NAME
Courthouse Plaza Design
RMP File Number
304
Date
4/27/2005
MO Ref
05-72 RD-05-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Redwood City Courthouse Plaza, Pavilions & Façade Lighting <br /> <br />11 March 2005 <br /> <br />Page 2 of 6 <br /> <br />1,5 Coordination Meetings in San Francisco with Architect and Landscape Architect to discuss preliminary computer renderings to <br />be prepared by the Architect or Others (time for two (2) meetings attended by a Principal of the firm or the Project Director is <br />included in the fee). <br /> <br />1,6 Conceptual design and analysis to assist the Architect and Landscape Architect in preparation of a preliminary computer <br />rendering including the proposed lighting design solutions. Deliverables will consist of sketches, preliminary calculations and <br />concept images to communicate the lighting design intent to the Architect. This proposal assumes that the Lighting Designer <br />will not prepare the actual computer renderings but will coordinate to improve the accuracy of the nighttime lighting represented <br />in the renderings prepared by the Architect or Others. <br /> <br />1.7 Review of preliminary cost estimate(s) prepared by Others, as related to the lighting, <br /> <br />1,8 Preliminary design and layouts of proposed lighting fixtures on transparencies provided by the Architect and Landscape <br />Architect or editing of preliminary CAD files prepared by the Architect or Landscape Architect. <br /> <br />1,9 Review meeting in San Francisco with Architect, Landscape Architect and the Contractor (time for one (1) meeting attended by <br />a Principal of the firm or the Project Director is included in the fee). <br /> <br />1.10 Updated design and layouts of proposed lighting fixtures on transparencies provided by the Architect and Landscape Architect <br />or editing of preliminary CAD files prepared by the Architect or Landscape Architect. Updated layouts will be incorporated in <br />the 60% set by the Architect, Landscape Architect, and Electrical Engineer, <br /> <br />1,11 Electric light level calculations (illuminance and luminance), as required for in-house verification of the lighting design concepts, <br /> <br />1,12 Preliminary lighting fixture schedule and preliminary cuts and/or detail drawings of proposed lighting fixtures to be incorporated <br />in documents prepared by the Electrical Engineer, Landscape Architect and Architect. <br /> <br />1,13 Specifications for the lighting fixtures, (Section 16500), <br /> <br />Phase II (Contract Documents) will consist of the following: <br /> <br />2.1 Conference in San Francisco with Architect, Landscape Architect and the Contractor (time for two (2) meetings attended by a <br />Principal of the firm or the Project Director is included in the fee), <br /> <br />2,2 Preparation of final layouts of proposed lighting fixtures after receipt of comments on 60% Contract Documents on <br />transparencies provided by the Architect or Landscape Architect or editing of preliminary CAD files prepared by the Architect or <br />Landscape Architect. <br /> <br />2.3 Assistance with coordination of lighting design with landscape, architectural, structural, electrical and mechanical design. <br /> <br />2.4 Final lighting fixture schedule and final cuts and/or detail drawings of proposed lighting fixtures to be incorporated in documents <br />prepared by the Electrical Engineer and Architect. <br /> <br />2.5 Updated specifications for the lighting fixtures, (Section 16500). <br /> <br />2,6 Review of 60% cost estimate prepared by the Cost Estimator or Contractor, and preparation of written comments as related to <br />the lighting design. <br /> <br />2,7 Review of final Contract Documents as prepared by the Landscape Architect and his Consultants, and as related to the lighting <br />(time for one (1) review and red line prior to 95% Contract Documents is included in the fee). <br /> <br />I <br />SF I LA I NY I 300 Brannan Street Suite 212 San Francisco CA 94107 415 348 8273 voice 415 348 8298 fax I www.HLBlighting.com I <br /> <br />""'----""'--"""'--'T'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.