My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 FTB - Freedman Tung & Bo
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 FTB - Freedman Tung & Bo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2006 4:04:03 PM
Creation date
5/4/2005 11:17:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
FTB - Freedman Tung & Bottomley
PROJECT NAME
Courthouse Plaza Design
RMP File Number
304
Date
4/27/2005
MO Ref
05-72 RD-05-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PETER KOGAN ASSOCIATES <br />Consulting Engineers <br /> <br />November 11, 2004 <br /> <br />Mr. Ronald Finger <br />FMG ARCHITECTS <br />330 Fifteenth Street <br />Oakland, CA 94612 <br /> <br />RE: <br /> <br />Redwood City Plaza <br />MEP Consulting Service <br /> <br />REVISED 02/22/05 <br /> <br />Dear Mr. Finger: <br /> <br />Thank you very much for considering our firm as a Mechanical, Plumbing and Electrical consultant. We <br />are pleased to provide our proposal for perform consulting services for the Redwood City Pavilion and <br />Plaza. <br /> <br />Our proposal is based on the scope of work described in the request for proposal from FTB and their <br />preliminary set of plans, and our telephone conve:r:sations regarding possible MEP scope. The proposed <br />services provide for Mechanical HV AC, Electrical and Plumbing systems for the following scope of <br />work: <br /> <br />Design of new power distribution and new electrical service for entire complex, including <br />Pavilion indoor and outdoor lighting, lighting for outdoor Plaza, connections for <br />fountain's pumps and equipment. <br />Design of new panelboards, power load calculations, new electrical power feed to the <br />project area and design of single line diagram. <br />Site plan design for lighting and power for the outdoor Plaza and area outlined as "Limit <br />of Work". <br />Provisions - conduit stub-outs with pull wires - for possible future telephone, <br />data/telecom services, per specific directions from the Owner. <br />Redwood City Plaza <br /> <br />A. <br /> <br />B. <br /> <br />C. <br /> <br />Mechanical Systems <br /> <br />Provisions for possible gas-fired radiant space heaters inside the Pavilion. <br /> <br />Plumbing Systems <br /> <br />Floor plan layout of main utility lines - cold water, waste, storm drain and gas lines for: <br /> <br />a. <br /> <br />Waste lines stub-outs in vicinity of future cafes (possible sinks). Drainage for fountains, <br />tied into sewer system, per directions from fountain's designers. <br />Water stub-outs for cafes, fountains, outside hose bibbs, irrigation/landscape system <br />Gas line stub-outs for possible heaters in Pavilion and stubs for future cafes <br />Coordinate with Architect the locations of stubs, hose bibbs, etc. <br />Complete and fill-in the PG&E New Service Application forms ~or gas loads. <br /> <br />b. <br /> <br />c. <br />d. <br /> <br />e. <br /> <br />Electrical Systems <br /> <br />a. <br /> <br />b. <br /> <br />c. <br /> <br />d. <br /> <br />. ,..--,-,...---.. '--'r ....,..,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.