Laserfiche WebLink
EXHIBIT "A" <br /> <br /> Mr. Bernard L. Pawlowski <br /> Community Development Director <br /> City of Redwood City <br /> October 28, 1988 <br /> Page Two <br /> <br /> 6. Review of Final Map with Architectural Plans to check air <br /> space. (Architectural plans were not submitted). <br /> <br /> II. IMPROVEMENT PLANS <br /> <br /> 1. Review of Improvement Plans for compliance with City <br /> Standards. <br /> <br />2. Review of the Improvement Plans for conformance with the Final <br /> Map. <br /> <br /> 3. Review of the Engineer's Estimate for bonding and fees. <br /> <br /> 4. Review of the Technical Specifications (for comparison to Unit <br /> 1 and City Standard Specifications). <br /> <br /> 5. Review for compliance with the Tentative Map and Tentative Map <br /> Conditions. <br /> <br /> 6. Review of the Joint Trench Utility Drawings for conformance <br /> with Utility layout. <br /> <br /> 7. Review and conformance with the recommendations of the Soils <br /> Report. <br /> <br /> 8. Review of Finish Grading Plans (L.10, L.11 & L.12) <br /> <br />9. Review of Landscape Drawings for coordination with the <br /> Civil/Site Plans. <br /> <br />III. LAKE IMPROVEMENTS (Design by J. Harlan Glenn & Associates) <br /> <br />1. Review of the waterscape construction details and <br /> specifications. <br /> <br />2. Review of the lake fountain pump station and associated water <br /> system for Unit 2. <br /> <br />The proposal and review is based on our completion of several of <br />the work items under the Contract Documents for Unit 1. The <br />following items are included: <br /> <br /> o Hydrology/hydraulic calculations were approved for Units 1 <br /> and 2 based on the signed and stamped calculations of May <br /> <br /> <br />