My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 DPR Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 DPR Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2007 12:38:09 PM
Creation date
5/9/2005 9:58:47 AM
Metadata
Fields
Template:
Agreement
Contractor Name
DPR Construction
PROJECT NAME
historical courthouse restoration
RMP File Number
304
Date
5/6/2005
MO Ref
05-42; RD 07-003; 07-030
Amendment
Yes
Box
6361
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.3.13 Maintain On-Site Records. CM/GC shall develop and implement a comprehensive <br />document management program for the Project. CM/GC shall maintain at the Project site, on a <br />current basis: a record copy of all contracts, drawings, specification, addenda, change orders, <br />revisions issued by the design team and other modifications, all in good order and marked to <br />record all changes made during construction; as well as shop drawings; product data; samples; <br />submittals; purchases; materials; equipment; applicable handbooks; Titles 21 and 24 of the <br />California Code of Regulations; the California Uniform Building Code; maintenance anp <br />operating manuals and instructions; other related documents and revisions that arise out of the <br />Work. <br /> <br />2.3.14 Buildinq Records. CM/GC shall maintain records for all new construction of principal <br />building layout lines, elevations for the bottom of footings, floor levels and key site elevations <br />certified by a qualified surveyor or professional engineer, if necessary. CM/GC shall make all <br />records available to City/Agency. At the completion of the Project, CM/GC shall deliver all such <br />records to City/Agency. <br /> <br />2.3.15 Schedule of Values and Processinq of Payments. Upon award of the Trade Contracts, <br />each Trade Contractor will qualify for payments in accordance with its Trade Contract. CM/GC <br />will administer payments to the Trade Contractors and the schedule of values described in <br />paragraph 2.2.9. City/Agency shall pay CM/GC amounts payable to the Trade Contractors <br />upon certification by CM/GC that the money is properly owed and that the Trade Contractors <br />have completed that portion of the Work equal to the proportion of money to be paid, subject to <br />withholding for retention as set forth in the this Agreement. The total amount paid by <br />City/Agency for each Trade Contractor shall be no more than the original Trade Contract <br />amount with such changes as approved by City/Agency and CM/GC. <br />2.3.16 Change Orders. <br /> <br />.1 City/Agency, without invalidating this Agreement, and as provided by law, may <br />order extra work or make changes by altering, adding to, or deducting from Work or Services on <br />the Project. All such Work and Services shall be executed under the Gonditions of the original <br />Contract Documents. City/Agency agrees that in giving instructions, CM/GC shall have <br />authority to make minor changes in the Work, not involving change in cost, and not inconsistent <br />with the purposes or approvals of the Project. Otherwise, except in an emergency endangering <br />life or property, no extra work or change shall be made unless pursuant to a written order <br />approved and executed by City/Agency. <br />Atty/Agr/2005.003 <br />030805/L, Beck/50? 588v? <br /> <br />Page 28 of 30 <br /> <br />....-.., ~.. ---"-' <br />
The URL can be used to link to this page
Your browser does not support the video tag.