My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Josh Cahalan ASLA
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Josh Cahalan ASLA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:57:56 PM
Creation date
5/9/2005 11:29:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Josh Cahalan ASLA
PROJECT NAME
landscape architectural services
RMP File Number
304
Date
3/1/1999
Reso Ref
13561
MO Ref
99-125 01-110
Task Order
Yes
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXf.f1BIT "A" <br /> <br />John Cahalan, A~ià <br />Landscape Architect <br /> <br />1.0 <br /> <br />1.01 <br /> <br />1.02 <br /> <br />1.03 <br /> <br />1.04 <br /> <br />1.05 <br /> <br />1.06 <br /> <br />1.07 <br /> <br />1.08 <br /> <br />1.09 <br /> <br />Landscape Architecture <br />Urban Planning & Design <br />Environmental Planning <br /> <br />Scope of Services for: . <br />EL CAMINO REAL MEDIAN LANDSCAPING <br />Redwood City, CA <br />February 4, 1999 <br /> <br />PRELIMINARY DESIGN <br /> <br />Pre-Design Meeting: Meet with City staff and the £1 Camino Real Task Force to <br />discuss project's history and to agree on project approach, objectives and schedule. <br /> <br />Site Reconnaissance: Conduct an evaluation of the existing medians including traffic <br />and pedestrian circulation patterns and existing site features including landscaping and <br />hardscape. Conduct an inventory of the existing irrigation system to determine the extent <br />of the necessary renovations and new tie in points for electrical and water service. Obtain <br />sample(s) of existing topsoil for lab analysis to determine proper amendments for new <br />planting. Photograph the existing medians for "in-house" reference and to document <br />existing conditions. <br /> <br />Base Sheets: Prepare base sheets at 1"=20' -0" scale using base data and record drawings <br />provided by the City. Base sheets will be prepared on 30" x 42" standard City title block <br />sheets. At this scale, on this size sheet, there would be a total of 8 base sheets with 3 <br />road strips per sheet with matchlines. <br /> <br />Preliminary Design: Prepare design concept(s) for landscaping, median entry signs and <br />related improvements along £1 Camino Real from the Atherton to the San Carlos City <br />limits. Plans shall include plan view, elevation and sectional sketches necessary for staff <br />evaluation and public presentation. Render all drawings in color. <br /> <br />Cost Estimates: Prepare a detailed estimate of probable construction costs for all <br />landscape related site improvements and other project costs. <br /> <br />Schedule: Develop comprehensive project schedule from pre-design through <br />construction. Update schedule as necessary to accommodate project scope changes and <br />public meetings. <br /> <br />Staff Meetings: Attend a total of four (4) meetings with City staff and the £1 Camino <br />Real Task Force for design review and discussion of project scope, schedule and budget. <br /> <br />Caltrans SubmittallReview: Meet with Caltrans and review proposed design. Submit <br />plans for their review and approval. Respond to minor revisions. <br /> <br />Public Review: Facilitate and conduct a total of three (3) public information sessions to <br />inform the public ofthe nature ofthe project and receive input into the design concepts. <br /> <br />523 King Street. Redwood City, California 94062. (650) 368-6456. Fax (650) 368-6457 . CA Reg. No, 2894 <br /> <br />,.. <br /> <br />."'.""""".-."'---"".'---""".'.'" .,....--....."... <br />
The URL can be used to link to this page
Your browser does not support the video tag.