My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Josh Cahalan ASLA
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Josh Cahalan ASLA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:57:56 PM
Creation date
5/9/2005 11:29:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Josh Cahalan ASLA
PROJECT NAME
landscape architectural services
RMP File Number
304
Date
3/1/1999
Reso Ref
13561
MO Ref
99-125 01-110
Task Order
Yes
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EI Camino Real Medians <br />Scope of Services <br />February 4, 1999 <br />Page 2 of 4 <br /> <br />1.10 <br /> <br />1.11 <br /> <br />1.12 <br /> <br />Final Site Plan: Prepare final preliminary landscape plans and render in color. Revise <br />estimate of probable project costs to reflect final design. <br /> <br />Planning Commission Meeting: Attend a meeting to present the project to the Planning <br />Commission as requested by staff. <br /> <br />City Council Meeting: Attend a meeting to present the project to the City Council as <br />requested by staff. <br /> <br />Preliminary Design Fee .for Median Landscaping...........................................................$17, 750 <br /> <br />Preliminary Design Fee for Entry Feature.........................................................................$5,500 <br /> <br />2.0 <br /> <br />2.01 <br /> <br />2.02 <br /> <br />2.03 <br /> <br />2.04 <br /> <br />2.05 <br /> <br />2.06 <br /> <br />2.07 <br /> <br />CONSTRUCTION DOCUMENTS & SPECIFICATIONS <br /> <br />Meetings: Attend a total of four (4) meetings to coordinate work in progress with the <br />Engineering Department, discuss City's comments on progress submittals and to review <br />project budget and schedule. <br /> <br />Demolition Plans: Prepare plans including legend and notes for demolition work <br />for paving, tree and shrub removal. (8 sheets of drawings) <br /> <br />Site Construction Plans: Prepare plans including legend and notes for site construction <br />work for new median paving, limited curb replacement, and small entry signs at each end <br />of the City limits. (8 sheets of drawings) <br /> <br />Irrigation Plans: Prepare plans including legend, details and' notes for automatic <br />irrigation system for all new landscape areas. (8 sheets of drawings) <br /> <br />Planting Plans: Prepare plans including legend, details and notes for all new and <br />renovated landscape areas. (8 sheets of drawings) <br /> <br />Construction Details: Prepare construction details for all new improvements including <br />median paving, curbs, and median entry signs. (5 sheets of drawings) <br /> <br />Progress Submittals: Prepare 50% and 90% complete construction documents to City <br />of Redwood City standards and submit for review. Submit 90% set to CaItrans. <br /> <br />,._...."'.~....., ,'u' .........,..-.-,--..........-...-.-.--..-,..,---....--'---......"..---...-- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.