Laserfiche WebLink
<br />Table 1 - Itemized Cost Estimate <br />Environmental Consulting Services <br />Stulsaft Park <br />Redwood City, California <br /> <br />Subsurface Consultants, Inc. <br /> <br />.' <br /> <br /> SCI LABOR EX PE N 5 E 5/5 U BCONTRA C TORS ESTIMATED COSTS <br /> ESTIMATED SCI LABOR (Hours) UNIT QUANT COST TOTAL SUB <br />TASKS COST TOTALS <br /> SCI Personnel & Rates ($/hr) PER ITEM <br /> <br /> Clerical WP Draft Tech Staff Geo Proj Assoc Prin QAlQC ($) ($) <br /> 45 45 75 60 78 87 111 130 140 140 ($/unit) <br />5.1.4 - Boundary Area 4 24 8 2 1 Truck 2.5 $64 $3,776 <br />Subcontractors <br />Driller days 2 $2,300 $4,600 <br />Analytlcal- Cr, NI, and Hg test 15 $75 $1,121 <br />pH test 5 $23 $115 <br />Subtotal $9,612 <br />5.2 - Background Study 8 4 20 8 2 copies 1 $115 $4,195 <br />5.3 - Mercury Speciation Study 12 20 2 $4,212 <br />Analytical - HNO3 & Aqua Regia test 15 $230 $3,450 <br />Shipping 1 1 ea 1 $115 $247 <br />5.4 - Ambient Air Study 48 10 1 truck 3 $64 $4.512 <br />Sampling Equipment week 1 $690 $690 <br />Field Supplies week 1 $230 $230 <br />Analytical - test 8 $92 $736 <br />Shipping 1 1 1 ea 2 $115 $422 <br /> <br />5.5 - Data Compilation and Evaluation 12 30 4 2 $3,680 <br />5.6 - Site Investigation Report <br />Administrative Draft 4 8 12 20 40 30 16 copies 4 $29 $13,695 <br />Regulatory Draft 6 4 4 12 6 1 copies 12 $29 $3,347 <br />Final draft 10 4 1 16 8 2 copies 12 $29 $4,146 <br /> <br />TOTAL ESTIMATED COST: TASK 5 $119,868 <br />Task 6 - Risk Ass..sment 4 10 30 16 $7,430 <br />6.1 - Prepare Risk Assessment fee 1 $32,200 $32,200 (100% of estim, <br />6.2 - Other Risk Assessment-Related Services Tee u.r:> ~lJ,6UU ~lU,J:>U (f:>"fo 01 estimate) <br />TOTAL ESTIMATED COST: TASK 6 $49,980 <br /> <br />TOTAL ESTIMATED COST $192,350 $192,350 <br /> <br />-1 <br /> <br />Task Order 2 <br /> <br />Page 2 of 2 <br /> <br />5/6/99 <br />11:28 AM <br />