My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-10-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-10-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 8:33:20 AM
Creation date
10/19/2017 3:26:13 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. 1. D. - Page 6 <br />EXHIBIT "A" <br />SCOPE OF SERVICES. TIME SCHEDULE AND FEE SCHEDULE <br />Task 5.2.1— PEER (Permit Engineering Evaluation Report) Review Process <br />WRECO will take the lead in gaining approval for the PEER and preparing the technical reports, structural <br />calculations and design plans & specifications required to attain Caltrans approval. This task includes the <br />following: <br />• Project coordination and three (3) additional meetings with the City. <br />• Attend four (4) Caltrans meetings. <br />• Prepare the PEER report and technical reports needed for the PEER process. <br />• Review all design features to ensure that the Project meets Caltrans' standards. <br />• Prepare geotechnical recommendations for installing utilities under pathway. Includes pile <br />capacities analysis to be included in recommendations. <br />• Prepare pressure diagrams for the tieback wall that includes seismic loading and lateral loading. <br />Also provide vertical and lateral capacities of 14 -inch diameter steel piles. <br />• Update Log of Test boring sheets to meet Caltrans requirements. <br />• Revise structural design to meet Caltrans 2015 Standard Plans & Specifications. <br />• Provide structural design and check calculations based on the latest AASHTO Bridge Design <br />Specifications. <br />• Resubmit design plans and specifications for Caltrans Review (95% and Final) <br />Deliverables <br />• Caltrans PEER Report (Draft and Final) - PDFs <br />• 95% Design Submittal to Caltrans (includes structural calculations) — PDF <br />• Final Design Submittal to Caltrans — PDF <br />Task 5.2.2 — Regulatory Agency Permitting <br />WRECO will assist the City in gaining regulatory agency permit approvals. This task includes the <br />following: <br />• Permitting coordination <br />• Responding to agency comments <br />• Attend two (2) additional site visits <br />Deliverables <br />• Responses to Agency Permitting Comments — PDF <br />Task 5.2.3 — Utility Coordination <br />REV: 10-03-17 PR <br />Page 3 of 5 <br />ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />
The URL can be used to link to this page
Your browser does not support the video tag.