Laserfiche WebLink
6. 1. D. - Page 6 <br />EXHIBIT "A" <br />SCOPE OF SERVICES. TIME SCHEDULE AND FEE SCHEDULE <br />Task 5.2.1— PEER (Permit Engineering Evaluation Report) Review Process <br />WRECO will take the lead in gaining approval for the PEER and preparing the technical reports, structural <br />calculations and design plans & specifications required to attain Caltrans approval. This task includes the <br />following: <br />• Project coordination and three (3) additional meetings with the City. <br />• Attend four (4) Caltrans meetings. <br />• Prepare the PEER report and technical reports needed for the PEER process. <br />• Review all design features to ensure that the Project meets Caltrans' standards. <br />• Prepare geotechnical recommendations for installing utilities under pathway. Includes pile <br />capacities analysis to be included in recommendations. <br />• Prepare pressure diagrams for the tieback wall that includes seismic loading and lateral loading. <br />Also provide vertical and lateral capacities of 14 -inch diameter steel piles. <br />• Update Log of Test boring sheets to meet Caltrans requirements. <br />• Revise structural design to meet Caltrans 2015 Standard Plans & Specifications. <br />• Provide structural design and check calculations based on the latest AASHTO Bridge Design <br />Specifications. <br />• Resubmit design plans and specifications for Caltrans Review (95% and Final) <br />Deliverables <br />• Caltrans PEER Report (Draft and Final) - PDFs <br />• 95% Design Submittal to Caltrans (includes structural calculations) — PDF <br />• Final Design Submittal to Caltrans — PDF <br />Task 5.2.2 — Regulatory Agency Permitting <br />WRECO will assist the City in gaining regulatory agency permit approvals. This task includes the <br />following: <br />• Permitting coordination <br />• Responding to agency comments <br />• Attend two (2) additional site visits <br />Deliverables <br />• Responses to Agency Permitting Comments — PDF <br />Task 5.2.3 — Utility Coordination <br />REV: 10-03-17 PR <br />Page 3 of 5 <br />ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />