My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-10-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-10-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 8:33:20 AM
Creation date
10/19/2017 3:26:13 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 7 <br />WRECO will assist the City with utility coordination with PG&E and AT&T to relocate their facilities <br />from under US 101. This task includes the following: <br />• Attend three (3) utility coordination meetings <br />• Prepare exhibits (typical section, proposed AT&T relocation) <br />• Pothole existing utilities where AT&T conduits will potentially cross <br />• Design of PG&E conduits under the path into the final design. Design for buoyancy uplift. <br />Deliverables <br />• Conceptual AT&T utility relocation exhibit— PDF <br />• Conceptual typical section under US 101 with utilities - PDF <br />Task 5.3 —100% Final Design PS&E (Additional Work) <br />The new storm drain pump station and new waterline projects were constructed within the project limits <br />and will impact the design of the project. To compete the design of the project, the following task are <br />required: <br />• Pothole new waterline <br />• Supplemental topographical survey to account for newly constructed storm drain pump station, <br />utility boxes, and electronic sign that was installed within the project limits recently <br />• Coordinate and design service connections for power with newly constructed SD pump station <br />• Design SD improvements (relocate discharge line & remove abandon facilities) associated with <br />new SD pump station <br />Task 6.1— Construction Support (Biological Monitoring) <br />WRECO will provide Biological support during construction as required by the environmental documents <br />and agency permits. This task includes the following: <br />• Biological surveys (sensitive plants, bats, nesting birds, active nests) and Results Report <br />• Preconstruction preparation <br />• Environmental Awareness Training (includes training pamphlet preparation) <br />• Biological monitoring during temporary cofferdam installation (turbidity monitoring) <br />• Post -Construction As -Built Report <br />• Post -Construction Planting Report and photo -documentation <br />• Field delineation of Environmental Site Assessment and exclusion fencing <br />Deliverables <br />• Special Status Species Survey Results, Bird Survey Results Reports — PDFs <br />• Environmental Awareness Training pamphlets — 30 hard copies <br />• Post -Construction As -Built Report - PDF <br />• Re -vegetation & Planting Report — PDF <br />• Turbidity Monitoring Log - PDF <br />REV: 10-03-17 PR <br />Page 4 of 5 <br />ATTY/AGR.Amend No. 3 /Wreco -US 101 UC <br />
The URL can be used to link to this page
Your browser does not support the video tag.