Laserfiche WebLink
6.1.D. - Page 7 <br />WRECO will assist the City with utility coordination with PG&E and AT&T to relocate their facilities <br />from under US 101. This task includes the following: <br />• Attend three (3) utility coordination meetings <br />• Prepare exhibits (typical section, proposed AT&T relocation) <br />• Pothole existing utilities where AT&T conduits will potentially cross <br />• Design of PG&E conduits under the path into the final design. Design for buoyancy uplift. <br />Deliverables <br />• Conceptual AT&T utility relocation exhibit— PDF <br />• Conceptual typical section under US 101 with utilities - PDF <br />Task 5.3 —100% Final Design PS&E (Additional Work) <br />The new storm drain pump station and new waterline projects were constructed within the project limits <br />and will impact the design of the project. To compete the design of the project, the following task are <br />required: <br />• Pothole new waterline <br />• Supplemental topographical survey to account for newly constructed storm drain pump station, <br />utility boxes, and electronic sign that was installed within the project limits recently <br />• Coordinate and design service connections for power with newly constructed SD pump station <br />• Design SD improvements (relocate discharge line & remove abandon facilities) associated with <br />new SD pump station <br />Task 6.1— Construction Support (Biological Monitoring) <br />WRECO will provide Biological support during construction as required by the environmental documents <br />and agency permits. This task includes the following: <br />• Biological surveys (sensitive plants, bats, nesting birds, active nests) and Results Report <br />• Preconstruction preparation <br />• Environmental Awareness Training (includes training pamphlet preparation) <br />• Biological monitoring during temporary cofferdam installation (turbidity monitoring) <br />• Post -Construction As -Built Report <br />• Post -Construction Planting Report and photo -documentation <br />• Field delineation of Environmental Site Assessment and exclusion fencing <br />Deliverables <br />• Special Status Species Survey Results, Bird Survey Results Reports — PDFs <br />• Environmental Awareness Training pamphlets — 30 hard copies <br />• Post -Construction As -Built Report - PDF <br />• Re -vegetation & Planting Report — PDF <br />• Turbidity Monitoring Log - PDF <br />REV: 10-03-17 PR <br />Page 4 of 5 <br />ATTY/AGR.Amend No. 3 /Wreco -US 101 UC <br />