My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-10-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-10-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 8:33:20 AM
Creation date
10/19/2017 3:26:13 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 8 <br />Assumptions <br />• PEER review process will be the Caltrans approval route. <br />• Fact sheets limited to two (2) non-standard features (mandatory or advisory). <br />• Two submittals only are needed for Caltrans PEER review process. <br />• Newly installed SD pump station and waterline does not significantly impact design of this <br />project. <br />• The utility agencies will use AT&T and PG&E's temporary and proposed design. Any easement <br />requirements will be the responsibility of the utility agencies. <br />• Assumes previous survey controls are existent and available. <br />• City will be responsible to ensure regulatory agencies permit requirements are met. <br />• City will be responsible to make all submittals to regulatory agencies. <br />• Only two Post -Construction Planting Reports will be prepared; one post -planting report, as <br />required by the Regional Water Quality Control Board conditions, and a year one planting report, <br />as required by the California Department of Fish and Wildlife permit conditions. <br />• The U.S. Fish and Wildlife Service and National Marine Fisheries have not issued Letters of <br />Concurrence or Biological Opinions for the project; therefore, any additional potential biological <br />monitoring and/or reporting costs have not been included in this estimate. <br />Task performed will be billed on 2017 billing rates attached hereto. <br />REV: 10-03-17 PR <br />Page 5 of 5 <br />ATTY/AGR.Amend No. 3 /Wreco -US 101 UC <br />
The URL can be used to link to this page
Your browser does not support the video tag.