Laserfiche WebLink
6.1.D. - Page 9 <br />Engineering Design Services for 101 <br />Pedestrian Crossing <br />Man -Hour and Fee Estimate for the WRECO Project Team Tasks <br />Biological Support <br />Prepared for the City of Redwood City <br />Prepared by the WRECO Project Team <br />August 3, 2017 <br />Project Team <br />Preconstruction Preparation <br />$ 760.00 <br />Subtotal <br />Subtotal <br />Task Task Description <br />Fee <br />Hours <br />PHASE 11 <br />40 <br />Post Construction As-Builts Report <br />5 CONSTRUCTION DOCUMENTS <br />46 <br />Post Construction Planting Reports <br />Caltrans Peer Report (Draft) <br />$ 18,960.00 <br />162 <br />Caltrans Design Submittal <br />$ 21,320.00 <br />176 <br />Structural Calculations (Draft) <br />$ 33,340.00 <br />214 <br />Internal QA/QC <br />$ 1,28500 <br />7 <br />Respond to Caltrans Review <br />S 2,790.00 <br />16 <br />Caltrans Peer Report (Final) <br />$ 10,640.00 <br />90 <br />Caltrans Design Submittal <br />$ 6,650.00 <br />50 <br />Structural Calculations (Final) <br />$ 1,070.00 <br />5 <br />Internal OA/QC <br />$ 1,285.00 <br />7 <br />Review Meetings with Caltrans (4) <br />$ 3,610.00 <br />18 <br />Regulatory Agency Permitting Coordination <br />$ 2,240.00 <br />16 <br />Respond to Comments <br />$ 620.00 <br />4 <br />Additional Site Visits (2) <br />$ 900.00 <br />6 <br />Review of City Waterline Project <br />$ 540.00 <br />4 <br />SD Pump Station Coordination & Design <br />$ 11,718.00 <br />86 <br />Utility Coordination (PG&E and AT&T) <br />$ 2,720.00 <br />16 <br />Coordination Meetings (3) <br />$ 1,530.00 <br />9 <br />Prepare Exhibits (Typ Section & AT&T Relocate) <br />$ 570.00 <br />5 <br />Design of PG&E conduits under path <br />$ 4,560.00 <br />32 <br />Subtotal <br />S 126.348.00 <br />923 <br />6 CONSTRUCTION SUPPORT <br />Biological Support <br />Biological Surveys <br />$ 5,080.00 <br />50 <br />Preconstruction Preparation <br />$ 760.00 <br />8 <br />Evironmental Awareness Training <br />$ 1,680.00 <br />18 <br />Biological Monitoring during Cofferdam Install <br />$ 3,800.00 <br />40 <br />Post Construction As-Builts Report <br />$ 4,520.00 <br />46 <br />Post Construction Planting Reports <br />$ 4,520.00 <br />46 <br />Subtotal <br />$ 20,360.00 <br />208 <br />Phase 11 Subtotal I <br />$ 146,708.00 <br />1131 <br />OTHER DIRECT COST <br />Travel <br />$ 800.00 <br />700 Reproduction <br />$ 500.00 <br />Supplemental Topographical Survey <br />$ 3,330.00 <br />Potholing (6 Locations) <br />$ 7,334.00 <br />ODC Subtotal <br />$ 11,964.00 <br />Total Amendment Cost 1 $158,672.00 ( 1131 1 <br />$ 158,672.00 <br />ATTY/AGR.Amend No. 3 Mreco - US 101 UC <br />