My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Green Environment (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Under $60K
>
Agmt05 Green Environment (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2008 11:24:25 AM
Creation date
6/22/2005 11:04:40 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Environment
PROJECT NAME
professional consulting services
RMP File Number
304.5
Date
5/10/2005
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 3 <br />Proposal for Phase II Investigation <br /> <br />707 Bradford, Redwood City, CA. <br /> <br />PROJECT COST (INCLUDES REPORTS) <br /> <br />GEl will complete the project scope specified above, not to exceed the following <br />estimated cost: <br /> <br />Total Cost............................................................................................................... $2 0, 7 00 * <br /> <br />*GEI has provided an itemized breakdown of estimated costs below. <br /> <br />ITEM <br /> <br />ESTIMATED COST <br /> <br />1. <br />2. <br /> <br />Pre-field and Field work (CA RG and field-tech) <br />Report including all figures and tables. <br />(CA RG, Engineer, Senior Staff) <br />Field Instruments <br />Lab analytical (STL San Francisco) <br />Driller including mob/demob 1.5 Days (Enprobe) <br />Expendables (temp well casings, probe liners, etc.) <br />Utility locator and prefield activities <br />County Permit Fees (four parcels) <br /> <br />4500 <br />200 <br />7700 <br />2350 <br />400 <br />500 <br />1792 <br /> <br />3250 <br /> <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br /> <br />PROJECT TIMELINE <br />Item <br />Work plan and permit submittal <br />GPP Response and possible conditions requiring work plan edits <br />Field work and sample submittal <br />Analytical results <br />Report Submittal to RWC <br /> <br />Completed by Day**: <br />3 <br />13 <br />15 <br />20 <br />23 <br /> <br />** Business day after execution of contract (Day 0). <br /> <br />PROJECT LIMITATIONS <br /> <br />GEl's scope of work and projected cost does not include disposal of soil cuttings or <br />decon water. San Mateo County GPP may require additional scope items not included in <br />this proposal, however these items would be known prior to initiation of field work. <br />Submission of additional samples would increase analytical cost. <br />************************************************************************ <br /> <br />Please call me at (650) 508-8018 if you have any questions regarding this proposal. <br /> <br />Respectfully, <br />re. ó)lêDiMY <br />Christopher Wellise <br />Manager, Real Estate <br /> <br />u.-. _.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.