My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Mark Thomas Co, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Mark Thomas Co, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:38:16 PM
Creation date
6/23/2005 8:40:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas Co, Inc
PROJECT NAME
woodside Road widening project
RMP File Number
304
Date
8/28/2000
Reso Ref
13983
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br /> <br />SCOPE OF WORK: ROUTE 84 (WOODSIDE ROAD) WIDENING <br /> <br />Mark Thomas & Co. Inc. will perfonn all tasks in accordance with the City of Redwood <br />City requirements and will follow Caltrans and regulatory agency procedures. All work <br />reports and documents subject to review and approval of Caltrans will follow Caltrans' <br />current policies, guidelines, and procedures. <br /> <br />PLANS, SPECIFICATIONS, AND ESTIMATE <br /> <br />The basis of the design for the widening and improvements of Woodside Road will be the <br />Combined Project Study Report/Project Report, Geometric Approval Drawing, and Fact <br />Sheet for Route 84 (Woodside Road) as approved Caltrans. The plans, specifications and <br />estimate (PS&E) will be submitted for concurrent review by the City of Redwood City <br />and Caltrans at the 35%,65%, 95% and 100% level. Included during this phase of work <br />are the design surveys, geotechnical investigation and reports, right of way engineering, <br />aerially deposited lead testing and report, Phase II testing for hazardous materials, <br />potholing and locating existing underground utilities, and coordination with utility <br />companies for utility relocations. <br /> <br />ProJect Management <br /> <br />MTCo will attend monthly meetings as necessary with the City and Caltrans in order to <br />maintain the project schedule, identify trends and issues, seek resolution of any design <br />issues, and insure that the plans are in confonnance with Caltrans standards. This task <br />includes the preparation of trends meeting agenda, meeting minutes, and coordination of <br />the design effort with MTCo's subconsultants. <br /> <br />GPS Survey-Report <br /> <br />GPS surveys will be perfonned to establish horizontal and vertical control for <br />establishing the existing right of way and setting the control line and the location of <br />existing monumentation. All work will be perfonned to meet Caltrans current standards. <br />GPS work will be at least second order or better. A Draft report of the GPS Survey and <br />level run will be produced and submitted to Caltrans for their review. Caltrans' review <br />comments will be incorporated and a Final GPS Report will be submitted to Caltrans. <br /> <br />Right-of Way Engineering <br /> <br />MTCo will provide right of way engineering servIces in compliance with Caltrans <br />District 4 current requirements as follows: <br /> <br />0 Hardcopy Maps will be prepared showing the existing and proposed right of way, and <br />the control line for Woodside Road. The existing right of way lines will based on <br />Caltrans' record maps, MTCo field surveys, and preliminary title reports. The control <br />line for the widening of Woodside Road will be set based on the existing right of way <br />City of Redwood City - Route 84 (Woodside Road) Widening 08/08/00 <br />Proposal- PS&E <br /> <br />3 of 1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.