Laserfiche WebLink
<br /> ESTIMATED COSTS FOR Prepared by: Mark Thomas & Co. Inc. <br />ROUTE 84 (WOODSIDE ROAD) WIDENING PROJECT. PHASE II 8f7100 <br /> MARK THOMAS &CO.INC. TOTAL Parikh &Sùgirnura TOTAL Fehr& Peers TOTAL TOTAL <br /> 2 MAN Reimb. Geotech & Landscaping) (Signals/Lighting) F&P ESTIMATED <br />TASK JC/PC PE SRDE DE SURVEY MTCO PM PE Sr. Dgr. ReÌlnb. Subs PM PE Engr Reimb. COSTS <br />Task 1. Design Concept Approval <br />1,1 Project Management & Meetings 14.399 2,539 16,938 16 ~"Q <br />1.2 Data Gathering & Review 846 1,734 1,858 250 4,688 1,344 2,451 3,200 6,995 1 <br />1.3 Mapping 2,750 2,750 2,750 <br />1.4 Utility Coordination 2,539 1,156 2,477 100 6,271 6,271 <br />1.5 Drainage Report 1,440 6,770 6,357 4,128 100 18,795 18,795 <br />1.6 Geotechnical Design Report/Borings 4,249 12,118 10,062 26,500 52,929 52,929 <br />1.7 Aerially Deposited Lead Test & Report 635 15,650 16,285 16,285 <br />1.8 Phase II Testing 14,200 14,200 14,200 <br />1.9 SWPPP Report 960 3,385 1,156 2,064 350 7,915 7,915 <br />1.10 GPS Report 7,680 3,808 6,080 500 18,068 18,068 <br />1.11 Utility Potholing 846 206 9,000 10,053 10,053 <br />1.12 Lane Closure Report 240 423 663 2,150 4,596 100 6,846 7,509 <br />Subtotal Task 1 24,719 21,791 10,403 10,733 6,080 42,900 116,625 4,249 12,118 10,062 26,500 52,929 3,494 7,047 3,200 100 13,841 183,395 <br />Task 2 . Survey. RIW Engineering <br />2.1 Field Survey for Design 960 5,077 867 619 36,480 44,003 44,003 <br />2.2 Right of Way Engineering <br />a) Hardcopy Maps 5,760 12,694 7,430 12,160 1,600 39,644 3' <br />b) Appraisal Maps 4,320 10,155 4,954 250 19,678 1\', J <br />c) Field Surveys for Controls 1,920 3,808 12,160 17,888 17,888 <br />Subtotal Task 2 16,319 43,581 867 20,434 64,448 1,850 121,213 121,213 <br />Task 3 - Preliminary 35% Design <br />3.1 Line Drawings <br />a) TitielT ypical Sections 240 1,692 1,734 2,064 5,730 5,730 <br />b) Layout 960 6,770 5,779 6,192 1,500 21,201 21,201 <br />c) Drainage 960 2,539 3,468 2,890 9,856 9,856 <br />d) Pavement Delineation 240 1,692 1,734 2,477 6,143 6,143 <br />e) Signing 240 1,692 1,156 2,064 5,152 5,152 <br />D Signals/Lighting Concept 1,613 4,085 5,119 450 11,267 11,267 <br />g) Landscape & Irrigation 4,464 2,995 3.120 10,579 10,579 <br />Subtotal Task 3 2,640 14,386 13,870 15,686 1,500 48,082 4,464 2,995 3,120 10,579 1,613 4,085 5,119 450 11,267 69,929 <br /> <br />Page 3 of 4 <br />