My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt98 South Bayside System Aut
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1998
>
Agmt98 South Bayside System Aut
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:59:29 PM
Creation date
6/23/2005 10:59:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
computer network services
RMP File Number
304
Date
1/26/1998
Reso Ref
13278
MO Ref
98-034
Box
5935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />_.,.~,-,:,::~:~.;,. <br /> <br />DEC-31-1997 10:32 <br /> <br />FROM SBSA <br /> <br />TO <br /> <br />3bb2447 <br /> <br />P.O2 <br /> <br />Computer Network Agreement <br />With Redwood City <br /> <br />Exhibit A <br />Scope of Work <br /> <br />Task 1: <br /> <br />Network Installation Inspection <br /> <br />Define the completion of Beyond 2000's portion of the lMS Network installation using a <br />checklist developed from the Technical Specifications.] <br /> <br />Task 2: <br /> <br />Initial Configuration ofN"etwork Hardware and Software <br /> <br />Initial configuration of the network file server operating system (WíndO\...s NT) and <br />related network hardware devices (e.g., CD-ROM library, communications server, <br />backup tape drive, and printers). <br /> <br />Initial configuration of workstation operating systems (Windows 95) and soft\vare. <br /> <br />Initial confJ.guration of network management and virus protection utilities. <br /> <br />Initial in.~tánåtion and testing of legacy databases on file server. <br /> <br /><This corresponds with Phase T of the SBSA implementation in which seven or eight <br />users wm test nehvork functionality to support project management personnel;n <br />debugg1ng and fine-tuning SBSA policies, procedures. and configuration needs. > <br /> <br />Task 3: <br /> <br />Final Configuration of Network Hardware and Software <br /> <br />Finat configuration of the net\vork file server operating system find related network <br />hardware devices based On the experiences gained in Task 2. <br /> <br />Final configuration of workstation operating systen1s. <br /> <br />Final configuration of network l1lanagement and virus protec.tion sofhvare. <br /> <br />Final installation and testing of legacy databases on file server or workstation(s) as <br />indicated by results of Task 2, <br /> <br /><.This corresponds with SBSA Phase 11 in which configurations, policies, and procedures <br />are "finalized" based on the experience of Phase I. > <br /> <br />1 ¡,ïna/ TtdmÜ)(l/ Spec:{(i()(ltiolls Far h{formatio;l Managemcmf Sy.~tcm Neomrk. Juty 25. 1997. <br /> <br />.--.,.. r- <br />
The URL can be used to link to this page
Your browser does not support the video tag.