Laserfiche WebLink
<br />'3D-7 <br /> <br />METHODOLOGY: This measure is determine the effectiveness of the City's tree preservation <br />efforts and serve as a guideline to verify that the number of trees intended to be preserved are <br />preserved for at least three years after construction. The number of trees to be "saved" during <br />construction can be claimed during a project year. However, if a tree dies or falls over shortly after <br />construction it was not truly preserved. This measure will show if the trees were preserved or <br />should have been skipped avoiding construction or removed. If trees are dying, the root pruning <br />methods need to be examined. If trees are falling over, the root pruning choices need to be <br />examined. If the City is remaining within the preservation measure targets and trees are surviving <br />the construction, the correct choices are being made. <br /> <br />Staff will measure the number of trees root pruned, the number of trees removed and the number <br />of failures/fatalities that occur within three years over a project area. <br /> <br />, Gm/wpwInlpelformance measureslsid_lk main! perf meas2 <br /> <br />~---'-'T-" ' <br />