Laserfiche WebLink
<br />3H.7 <br /> <br />Task 2-2: Parking and On-Site Circulation <br /> <br />The site plan will be reviewed to assess the adequacy of the on-site circulation system for passenger <br />vehicles and trucks. Modifications to improve circulation will be recommended. The number of <br />proposed parking spaces will be compared to the City code requirements and any shortages will be <br />noted. Surveys to justify a reduced supply will be conducted as an additional service. <br /> <br />Part 3 - C/CA G Requirements <br /> <br />Task 3-1: CMP Network Roadways <br /> <br />Project impacts to nearby CMP facilities will be analyzed. These facilities include segments on US <br />101, SR 82 (El Camino Real), and SR 84 and the intersection of El Camino Real and Whipple <br />Avenue. . <br /> <br />Task 3-2: C/CAG Required Mitigation Measures <br /> <br />Measures to mitigate project impacts will be identified from the list contained in the CICAG <br />Technical Advisory Committee memorandum dated January 20, 2000 (or an updated version if <br />available). <br /> <br />Additional Services <br /> <br />This scope of work has been tailored to meet the specific requirements of this project. However, <br />additional work items may be needed as the study progresses. The additional services that are <br />beyond th~ scope of this study include, but are not limited to, additional traffic counts, analysis of <br />additional study locations, detailed operations analyses, evaluation of aiternative proj ect descriptions <br />or site plans, parking surveys or shared parking analyses, conceptual designs of mitigation measures, <br />responses to comments requiring technical analyses, and attending meetings or public hearings. We <br />will conduct additional services with authorization. <br /> <br />PIO308-5 <br /> <br />...._-------,-----"',"" <br />