Laserfiche WebLink
� <br /> 3 � r b means b which a develo er ma meet, in <br /> Y p Y part or in whole, traffic mitigation <br /> requirements under CEQA; provided that a developer required to pay a fee as <br /> mitigation, or construct an improvement as mitigation, under CEQA for <br /> transportation system improvements shail not be required to pay the <br /> transportation impact fee established under this Article for those same system <br /> improvements. � <br /> Section 18.247 — Definitions: � <br /> The following and words and terms as used in this Article shall have the meaning <br /> respectively ascribed thereto: <br /> 18.247.1 "Administrator" means the Director of Community Development Services, <br /> or his or her designee, who shall administer the provisions of this Article. <br /> 18.247.2 "Applicant" means the owner of real property proposed for development, <br /> or the Applicant's authorized agent. <br /> t8.247.3� "Capital Improvement" includes transportation planning, preliminary <br /> engineering, design engineering, land surveys, rights-of-way acquisition, <br /> construction engineering, permitting, construction, and inspection of aU <br /> necessary features for any road ("road" as used herein is interchangeable <br /> with "street") construction project, including, but not limited to: <br /> a. Construction of through lanes; <br /> b. Construction of tum lanes, <br /> c. Construction of bridges; <br /> d. Construction of drainage facilities in conjunction with roadway <br /> construction; <br /> swco��c�vo�d 6 <br /> Ord-105 <br /> FXS/ss <br /> 03/28/00 <br /> DES:rg:041i3/OOR; 04/17/OOR <br />