My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-05-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 9:45:53 AM
Creation date
6/28/2005 2:54:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/22/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l H -1.. <br /> <br />Site No. & Description Phase Project Phase Extent Approx. <br /> No. Distance <br />Site 1 - Katherine Avenue & 4 Iris Street (from Brewster Avenue 1280 feet <br />Side Streets (South of to James Avenue) <br />Brewster Avenue) (Cont'd) <br /> 5 Grand Street (from Katherine 1234 feet <br /> Avenue to James Avenue), and <br /> Fulton Street (from Brewster <br /> Avenue to Katherine Avenue) <br /> 6 Elwood Street (from Brewster 1230 feet <br /> Avenue to James Avenue) <br /> Site 1 - TOTAL LENGTH OF 8274 feet <br /> PIPE <br />Site 2 - Side Streets (North of 1 Opal Avenue, and Nevada Street 1400 feet <br />Brewster Avenue) (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 2 Myrtle Street, and Lowell Street 1445 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 3 King Street, and Jeter Street 1475 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 4 Iris Street, and Grand Street 1490 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 5 Fulton Street, and Elwood Street 1300 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> Site 2 - TOTAL LENGTH OF 7110 feet <br /> PIPE <br /> <br />Please see attached drawing of the project area. The Engineer's Estimate for the <br />construction work is $1,900,000 A copy of the contract documents are available for review <br />in Engineering and Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.