Laserfiche WebLink
<br />l H -1.. <br /> <br />Site No. & Description Phase Project Phase Extent Approx. <br /> No. Distance <br />Site 1 - Katherine Avenue & 4 Iris Street (from Brewster Avenue 1280 feet <br />Side Streets (South of to James Avenue) <br />Brewster Avenue) (Cont'd) <br /> 5 Grand Street (from Katherine 1234 feet <br /> Avenue to James Avenue), and <br /> Fulton Street (from Brewster <br /> Avenue to Katherine Avenue) <br /> 6 Elwood Street (from Brewster 1230 feet <br /> Avenue to James Avenue) <br /> Site 1 - TOTAL LENGTH OF 8274 feet <br /> PIPE <br />Site 2 - Side Streets (North of 1 Opal Avenue, and Nevada Street 1400 feet <br />Brewster Avenue) (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 2 Myrtle Street, and Lowell Street 1445 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 3 King Street, and Jeter Street 1475 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 4 Iris Street, and Grand Street 1490 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> 5 Fulton Street, and Elwood Street 1300 feet <br /> (from Hopkins Avenue to <br /> Brewster Avenue) <br /> Site 2 - TOTAL LENGTH OF 7110 feet <br /> PIPE <br /> <br />Please see attached drawing of the project area. The Engineer's Estimate for the <br />construction work is $1,900,000 A copy of the contract documents are available for review <br />in Engineering and Construction. <br />