My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-07-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-07-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:35:02 PM
Creation date
6/28/2005 4:05:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/10/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> Traffic Study for Proposed Peninsula Marina Office Center <br /> in Redwood City, California <br /> The purpose of the traffic study is to evaluate the impacts of the proposed Peninsula Marina <br /> Office Centre development on the surrounding transportation system. Currently, there are <br /> two scenarios for development of this project. Scenario A is the development of 280,000 <br /> square feet (s.f.) of office space with a multi-level parking structure, surface parking areas, <br /> and modifications to the adjacent marina parking areas. Scenazio B is the development of <br /> 170,000 s.f. of office space with surface parking areas only. This traffic study will evaluate <br /> the impacts of both project scenarios on the surrounding roadway network. <br /> The Century Theaters, located near the project site, is known to cause temporary traffic <br /> congestion in the study area when movie theater is at its peak on weekend evenings and <br /> during "blockbuster" releases. This congestion has been identified in previous studies as a <br /> potential problem for emergency vehicle access to other uses on Bair Island Road. A <br /> proposed extension of Blomquist Street has been identified for improving emergency and <br /> vehicular access to the area. This new roadway would extend Blomquist Street north over <br /> Redwood Creek, linking up with the existing East Bayshore Road, providing an alternate <br /> access route to the project site area. The need for this extension will be evaluated as part of <br /> this study. <br /> The key intersections that will be analyzed are: <br /> 1. NB US 101 ramps at Whipple Avenue (assume a signalized pedestrian <br /> crosswalk across Whipple) <br /> 2. Whipple Avenue and Veterans Boulevard <br /> 3. Woodside Road and Veterans Boulevazd* <br /> 4. Blomquist Street Extension and East Bayshore Road* <br /> 5. Maple Street and Veterans Boulevard* <br /> 6. Maple Street and Blomquist Street* <br /> 7. Blomquist Street and Seaport Boulevard* <br /> 8. U.S. 101 Ramps/Woodside Road-Seaport Boulevard* <br /> 9. East Bayshore Rd. at the Century Theater driveways (2) — PM only <br /> *Designates intersections which require analysis assuming the Blomquist Street <br /> Extension has been completed <br /> The intersections will be evaluated during the morning (AM) and evening (PM) peak hours <br /> for the following scenarios: <br /> ... _ _ _.._ <br /> .____. . _ .�. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.