My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-07-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-07-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:35:02 PM
Creation date
6/28/2005 4:05:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/10/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*'jE•Ib <br /> Scenario 1: Existing Conditions - Existing volumes obtained from counts. <br /> Scenario 2: Background Conditions - Existing volumes plus growth plus traffic <br /> from approved but not yet constructed developments in the area. <br /> Scenario 3: Project A Conditions - Background volumes plus traffic generated by <br /> Scenario A of the proposed project. <br /> Scenario 4: Project B Conditions - Background volumes plus traffic generated by <br /> Scenario B of the proposed project. <br /> Scenario 5: Cumulative Conditions — Volumes under Project A Conditions plus <br /> traffic generated by pending projects in the area (Scenazio A will <br /> generate more traffic, and represents a more conservative estimate of <br /> traffic volumes). Cumulative Conditions will be evaluated using the <br /> existing roadway network as well as with the Blomquist Street <br /> Extension. <br /> The tasks to be conducted in the analysis aze: <br /> Task 1- Collect Data and Evaluate Existing Conditions <br /> The physical characteristics of the site and the surrounding roadway network will be <br /> reviewed during a site visit to identify existing roadway cross-sections, intersection lane <br /> configurations, traffic control devices, surrounding land uses, and the locations of pedestrian, <br /> bicycle, and transit facilities. Existing operational deficiencies including the unloading of car <br /> dealership vehicles on East Bayshore Road and the project site will be investigated. <br /> Available data from previous traffic studies will be obtained. Traffic data and observations <br /> conducted for the existing movie theater will be reviewed and summarized. <br /> Existing AM and PM peak-hour intersection traffic volumes will be obtained from previous <br /> traffic studies and supplemented with new counts. We estimate that eleven new peak-hour <br /> intersection counts will need to be conducted. The cost for these new counts is approximately <br /> $2,200 and is included in the cost estimate for this Scope of Work. <br /> Existing observations of the surrounding roadway network will also be made at a time when <br /> movie theater use is at its peak (for example, opening night of an expected blockbuster <br /> movie). Circulation problems and duration of vehicle queues will be identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.