My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-07-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-07-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:35:02 PM
Creation date
6/28/2005 4:05:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/10/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�E-�� <br /> Potential impacts to other travel modes including walking (via sidewalks and the proposed <br /> Bay Trail connections), bicycling and transit will be identified with appropriate mitigation <br /> measures. <br /> The amount of project-generated traffic that will be added to CMP-monitored roadway <br /> facilities will be determined for both project scenarios. GCAG requires that all projects <br /> generating 100 or more peak hour trips must mitigate all peak hour trips generated. Measures <br /> for trip mitigation will be identified or methods to modify the traffic demand of the project, <br /> such as installing facilities and services to encourage use of alternate modes. <br /> Task 6- Evaluate Cumulative Conditions <br /> In addition to the buildout of proposed land uses in the Bair Island area, traffic projections <br /> from the C/CAG traffic demand model will be used to evaluate cumulative traffic conditions. <br /> The effect of the Blomquist Street extension will be evaluated based on peak hour traffic <br /> operations using traffic model volumes. Levels of service calculations and queuing analyses <br /> will be performed to identify cumulative intersection impacts without the proposed project. <br /> Project A traffic volumes will be redistributed to account for the Blomquist Street extension <br /> and manually added to the C/CAG traffic demand model volumes. Intersection levels of <br /> service will then be calculated. Cumulative impacts with the proposed project will then be <br /> identified. <br /> Task 7- Assess Site Access, On-Site Circulation, and Parking <br /> The site plans will be reviewed to assess the adequacy of the number and design of the <br /> driveways, the on-site circulation system, and the parking supply for both proposed projects. <br /> The impact that each proposed project scenario has on the marina parking supply and dry <br /> dock storage will also be addressed. <br /> Task 8— Assess Emergency Access <br /> The impact of the proposed project to emergency access will be assessed as part of this task. <br /> Fehr & Peers will estimate the level of new development that would trigger the need for a <br /> secondary access to the Bair Island area based on the need for an alternate evacuation route <br /> and to improve access for emergency vehicles. Criteria for evaluating this task will be <br /> reviewed with City staff and public safety officials. <br /> Task 9 - Prepare Documentation <br /> The results of the analysis will be documented in a report following the City of Redwood <br /> City guidelines. The draft report will be submitted to City Staff for review and comment. <br /> ... _._...._ _ .__.. ..__.�._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.