My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-08-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 8:42:53 AM
Creation date
6/28/2005 4:29:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/14/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'? <br /> • Prepare Draft Foundation Memo (Type Selection Letter): Prepare preliminary <br /> recommendations for foundations in accordance with DOS requirements and pro�lde a <br /> Type Selection Memo with the LOTB. Attend type selection meering in Sacramento for <br /> the proposed structure and any non-standard retaining wails. <br /> • Prepare Final Foundarion Report: Prepare detail report includin� desi�n <br /> recommendations for foundarion types and footing elevations lateral design capacities, <br /> pile foundation recommendarions or spread footings. <br /> • Discuss seismic considerations, evaluate the liquefaction potential and comment on the <br /> site soil conditions from this standpoint. Information related to Caltrans Seismic desi� <br /> criteria such as depth to rock like material and peak rock acceleration shall be provided. <br /> • Prepare a separate Foundation Report. <br /> � Using the general plan as a base map, prepare Log of Test Borings in accordance with <br /> the Caltrans standards. <br /> 1.10 & 1.11 Aerially Deposited Lead and Hazardoc�s Material Soil and Groundwater <br /> Sampling <br /> This work will be performed by our subconsultant, GEOCON, and will consist of the <br /> follow tasks. <br /> a) Pre-Field Activities <br /> � Prepare a Health and Safery Plan to provide �uidelines on the use of personal <br /> protective equipment and health and safety procedures to be implemented durin� the <br /> field activities. <br /> i Prepare and submit a workplan approval. The Workplan will outline the specific <br /> scope of work, procedures, and methods to be employed by Geocon to complete the <br /> proposed soil samplin; activities. The V�iorkplan will also include a site plan <br /> indicating the proposed boring locations. <br /> % Obtain a bonng permit from San Mateo County Environmental Health. <br /> : Pe:form an under�round utility survey to identify utilities in the vicinity of the <br /> proposed bonng locations at the hazardous matenals release sites identified in this <br /> proposal. <br /> � A Caltrans encroachment pennit may be required to perform the soil sampling <br /> activities w�ithin the Caltrans right of way. Costs associated with obtaining a Caltrans <br /> encroachmen[ permit and associated permit fees are not included herein. <br /> City of Belmont — Route 101/Ralsron Ave IC Modifications 07/06/00 <br /> Proposa! — PS&E <br /> � <br /> _ .., . _ ._.___.�. __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.