Laserfiche WebLink
• (1) top tension tube bearing <br /> • (1) lower oil tube <br /> • (2) intermediate oil tubes <br /> • (1) top oil tube <br /> • (1) set of motor bearings <br /> • Materials to rewind the 50 horsepower stator <br /> • 16" epoxy coated dresser coupling <br /> • Gasket set <br /> (ii) Contractor will also perform the following: <br /> • Sandblast and epoxy coat inside and outside of column <br /> • Rewind motor stator <br /> • Recondition motor <br /> • On-site installation <br /> (iii) All equipment and materials needed to perform the above work will be provided <br /> by the Contractor. <br /> 2. Payment Terms <br /> Contractor shall provide the services outlined herein for a flat fee of $59,355.38. Contractor shall <br /> invoice the City after all work has been completed and accepted by the City. <br /> REV: 10-05-17 MI <br /> Page 7 of 7 <br /> ATTY/AGR.2017.230/Pump Repair Service Co. - Douglas and 5th Ave Pump Repair <br />