Laserfiche WebLink
a. Permit Finding. Decisions regarding a Planned Development Permit <br />shall be based upon the purpose statement in this section. The design <br />and construction quality contained in all aspects of the development <br />plan is expected to exceed the quality standards typically required for <br />new developments located in similar Zoning Districts; and <br />The project design and construction quality exceeds the quality <br />standards typically required for new developments located in similar <br />Zoning Districts. The project incorporates green building techniques <br />with the proposed installation of solar panels on the roof, six electric <br />vehicle charging stations, and installation of dual plumbing for recycled <br />water. The building would be designed and built to 2016 CalGreen <br />Standards. With the proposed development of the new hotel, the <br />surrounding neighborhood would see improvements to the public <br />infrastructure with new wider and pedestrian -friendly sidewalks, <br />including bulb -outs on the four corners of Broadway and Beech Street, <br />new street trees, and undergrounding of overhead utilities. <br />b. Findings for Modifications to Development Standards. Modifications <br />may be granted if it is determined that the proposed development will <br />provide an environment of physical and functional desirability, in <br />harmony with the character of the surrounding neighborhood or district. <br />The project design with development standard modifications to reduce <br />the number of parking stalls from 91 to 84 spaces would increase the <br />functional desirability of the project. As part of the traffic analysis, a <br />parking study was prepared by Hexagon, the applicant's transportation <br />consultant, which determined that 82 parking spaces provided on-site <br />would adequately serve the hotel under normal conditions. During <br />peak conditions, the hotel operator would implement a parking valet <br />program that would park up to 95 vehicles in the garage. Without the <br />requested development standard modification, an additional six spaces <br />would need to be provided ether at -grade or in the garage, likely in a <br />second below -grade parking level. The modification and valet program <br />would functionally accommodate the expected peak hotel demand <br />without harming the desirability or character of the surrounding <br />neighborhood. The neighborhood character would be enhanced <br />through the development of a new, modern building and infrastructure <br />improvements such as wider sidewalks, corner sidewalk bulb -outs, and <br />utility undergrounding. The hotel would serve visitors to nearby Kaiser <br />Hospital and Stanford Healthcare, as well as other businesses in the <br />area. The hotel would also be consistent with the purpose of the <br />MUC-SB zoning district, which encourages projects that can be served <br />by multiple transportation modes including public transportation, ride - <br />sharing, bicycling, and walking. <br />ATTY/RESO.0093/PC RESO GRANTING APPROVAL OF A USE PERMIT -1690 BROADWAY <br />REV: 10-04-17 PR <br />Page 3 of 16 <br />