Laserfiche WebLink
•: ' � � � � <br /> . • . ,,., � � <br /> � -3- <br /> Among the major issues to be addressed in the EIR are: <br /> 1. Grading and removal of trees. <br /> 2. Revisions to the plans and specifications to meet current materials and <br /> � construction quality standards and provided an updated geologic report. <br /> Additional analysis of the stormwater discharge must be done to mitigate <br /> possible erosion, flooding or siltation in the natural waterway <br /> downstream from the point of discharge. <br /> 3. Sequencing of improvements to proceed in succession for both sides of <br /> the street. Work on both sides of the street must be done together � <br /> because retaining walls are needed to support the roadway. <br /> 4. The responsibility for maintenance of Laurel Way improvements must be � <br /> decided as follows: � <br /> � Alternate A- Dedication to the City of each street parcel as <br /> development proceeds. This will require City Council amendment <br /> of appropriate ordinance(sa. <br /> Alternate B- At the outset, all owners enter into an agreement <br /> to maintain the street improvements as a private street and grant <br /> Public Utility Easements to the City for the maintenance of <br /> water, sewer, gas, electric and storm drainage facilities. <br /> In either event, determination as to the adequacy of the street <br /> improvements for public health and safety purposes (e.g., use by fire <br /> apparatus, ather emergency vehicles� must be made. <br /> �. Geotechnical investigation for each building site. <br /> 6. Resolution of construction feas�bility problems svch as the <br /> acquisition of cut and fill slope easements. <br /> �� �' � � <br /> ernar L. aw os � es . i <br /> Comnunity Development Director City Manager � <br /> BLP:sh <br /> Atta c hmen ts i <br /> � <br /> i <br />