My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-10-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:17:14 PM
Creation date
7/6/2005 9:09:40 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
10/23/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g-� �� <br /> Mr. Brian Lee <br /> September 25, 2000 <br /> Page 4 <br /> ,'�n uutial plans submittal will be made upon the completion of the street layout. With City approval <br /> of the geometrics, City can forward the layout plans to others involved in the project. <br /> � submittal of PS&E will be made at the 65% completion stage for Ciry's review. �. <br /> :� semi-final submittal will be made at the 95% completion stage. <br /> With Cin•'s comments at this stage and with plans developed by others, the final 100% completion <br /> will be submitted for bidding. <br /> Task 9 — Bid Services <br /> Wilse�� Ham services provided during the bid process would consist of: <br /> 1. Responding to Contractors inquiries on technical matters. <br /> '_'. Preparing technical documents for addenda if required. <br /> 3. Participate in the pre-bid meeting. <br /> 4. Pro��ide recommendation for award of contract. <br /> Additional Services <br /> _�dditional ser��ices can be provided if the Ciry desires such. These services could include the <br /> following: <br /> 1. Traffic signal design at the Roosevelt Avenue/Hudson Avenue intersection. <br /> ?. Through the use of sub-consultants, the design and coordination of the undergrounding of <br /> utilit� facilities. <br /> 3. Ser��ices during construction such as: <br /> ■ Technical design for change orders. <br /> ■ Re�zew of Contractors submittals. <br /> ■ Participation in the pre-construction meeting. <br /> ■ Conduct site visits and prepare field reports. <br /> ■ Other construction work as requested b� the City. <br /> 4. Construction inspection. <br /> �. Consuucuon survevs. <br /> \\.�C.�I)\Y-DRI\'L\PR0IECT\?75-4G\09-2i-OO lcr Brian L.ee - Roose�•elt Desif;n.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.