Laserfiche WebLink
�� � � <br /> Mr. Brian Lee <br /> September 25, 2000 <br /> Page 3 <br /> Task 3 - Sewers <br /> The sewer system has been previously designed. The previous design will be included in the <br /> contract plans. Minor changes will be incorporated into these contract plans, such as a change in <br /> pipe material. any major changes which involve redesign of the svstem or an� appreciable portion <br /> thereof, or anc changes requested after the 35% review will be considered as extra work. <br /> Task 4 — Water Lines <br /> The water s}�stem has been previously designed. The previous design will be included in the <br /> contract plans. Minor changes will be incorporated into these contract plans, such as changes in the <br /> pipe size as deternuned bv the Cit� . Any major changes which involve a redesign of the s� stem or <br /> anc appreciable portion thereof, or any changes requested after 35% review will be considered as <br /> extra work. <br /> Task 5 — Drainage <br /> Drainage from propem- to street will be maintained. City standards for minimum grades and cross <br /> slopes will be adhered to. A new drainage system will be established to provide drainage facilities <br /> for the new street cross section. <br /> Task 6 — Signals <br /> Neu� signals will be designed for the Valota Avenue intersecrion. <br /> Task7 — Coordination <br /> ��'ilse� Ham w-ill provide coordinarion with the Cin� and with its subconsultant, RKH. City will <br /> coordinate the work of other consultants or agencies it has contracted with for various work which <br /> aftect the project. <br /> \X%ilse� Ham will suppl�� base mapping and the project layout plans to the City for their coordinarion <br /> «7th others. <br /> Task 8 — PS&E <br /> The plans, specifications and Engineers estimate will be compiled b�� Wilse�� Ham. Wilsey Ham will <br /> coordinate PS&E b�- RILH and will include the undergrounding and lighting PS&E pro��ided by the <br /> Ciri• in hard copv signed and in disk form. The Title Sheet will be prepared for the total project. <br /> The ci�-il plans will include the ri�pical secuon sheet and special details. Citv standard details utilized <br /> w�ill be included as 8 1/2" x 11" sheets in the back of the specifications. <br /> Throughout the project informal meetings will be held with City staff regarding issues and progress <br /> of the project. <br /> \\:1C.\ll\P-llRl�"L\PR(>11��-T�'-��- Itr Bnan l.ee - Roosecelt Desi�,m.duc <br /> _ ... _ _.... .. .. . _ �... _ __ , . _._. ._ <br /> __ --._ <br /> . ...___T_ <br />