<br /> ESTIMATED COSTS FOR \XI
<br /> Prepared by: Mark Thomas & Co. Inc,
<br />ROUTE 84 (WOODSIDE ROAD) WIDENING PROJECT. PHASE II 817/00
<br /> MARK THOMAS & CO; INC. TOTAL ~árikh & Suglrriuni TOTAL Fithl- & Þ"1i TOTAL TOT~L
<br /> 2 MAN Reinib. Geòteth 3. Làndscaplng) (Signaltii../ghiliigj F&P ESTIMAte~
<br /> "
<br />TASK JC/PC PE SRDE DE SURVEY Mico PM PE St. Dgt. Relmb. Subs PM PE Enlir Rehnb. éoi;js
<br />Task 1. Design Concept Approval
<br />1,1 Project Management & Meelings 14,399 2,539 16,938 16,938
<br />1,2 Dala Gathering & Review 84!ì 1,734 1,858' 250 4,688 1.344 2,451 3,200 6,995 11,682
<br />1,3 Mapping 2,750 2,150 2,750
<br />1,4 Utility Coordinalion 2,539 1,156 2,477 100 6,271 6.271
<br />1,5 Drainage Report 1,440 6,770 6.357 4,128 100 18,795 18,195
<br />1,6 Geolechnical Design Report/Borings 4,249 12.118 10,062 26,500 52,929 52,929
<br />1,7 Aerially Deposited Lead Test & Report 635 15,650 16.285 16,285
<br />1,8 Phase II T esling 14,200 14,200 14,200
<br />1,9 SWPPP Report 960 3,385 1,156 2,064 350 1,915 7,915
<br />1.10 GPS Report 7,680 3,808 6,080 500 18,068 18,068
<br />1,11 Utility Potholing 846 206 9,000 10,053 10,053
<br />1,12 Lane Closure Report 240 423 663 2,150 4,596 100 6,846 7:øJ
<br />Subtotal Task 1 24,719 21,791 10,403 10,733 6,080 42,900 116,625 4,249 12,118 10,062 26,500 52,929 3,494 7,047 3,200 100 13,841 183,395
<br />Task 2 . Survey. RIW Engineering
<br />2,1 Field Survey for Design 960 5,077 867 619 36,480 44,003 44,003
<br />2,2 Right of Way Engineering
<br />a) Hardcopy Maps 5,760 12,694 7,430 12,160 1,600 39,644 39,644
<br />b) Appraisal Maps 4.320 10,155 4,954 250 19,678 19,678
<br />c) Field Surveys for Controls 1,920 3,808 12,160 17,888 17,888
<br />Subtotal Task 2 16,319 43,581 867 20,434 64,448 1,850 121,213 121.213
<br />Task 3 - Preliminary 350/. Design
<br />3,1 Line Drawings
<br />a) TilleIT ypical Sections 240 1,692 1,734 2,064 5,730 5.730
<br />b) Layoul 960 6,770 5,779 6,192 1,500 21,201 21,201
<br />c) Drainage 960 2.539 3,468 2,890 9,856 9,856
<br />d Pavement Delineation 240 1,692 1,734 2,477 6,143 6,143
<br />e) Signing 240 1,692 1,156 2,064 5,152 5,152
<br />ij SignalslLighling Concept 1,613 4,085 5,119 450 11.267 11.267
<br />g) Landscape & Irrigation 4,464 2,995 3,120 10,579 10.579
<br />Subtotal Task 3 2,640 14,386 13,870 15,686 1,500 48,082 4,464 2,995 3,120 10,519 1,&13 4,085 5,119 450 11,261 69,929