My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-11-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-11-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2005 10:45:12 AM
Creation date
7/6/2005 9:27:15 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
11/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7. 3 - C I b <br /> <br />Scope of Services <br />Medians Landscape Improvements. Redwood City <br />Revised: October 11, 2000 <br />Page 4 of 4 <br /> <br />SERVICE EXCLUSIONS: <br /> <br />The following tasks are considered to be outside the scope of services of this proposal but may <br />be provided by the Consultant as an additional service to the City of Redwood City as requested <br />and approved by the City of Redwood City: <br /> <br />. Civil Engineering services beyond what is described under 2.02 and 2..07. <br /> <br />. <br /> <br />Electrical Engineering services beyond what is described under the allowance for <br />Reimbursable Expenses for Broadway & Hopkins. <br /> <br />. <br /> <br />Structural Engineering services. <br /> <br />. <br /> <br />Preliminary Design including color plan renderings. sections, elevations and perspectives. <br /> <br />. Any additional plans. details or renderings required by the ARC or any other review <br />committee that are not considered a necessary part of the construction document phase of <br />these services. <br /> <br />. Design services where the estimated construction budget for both projects exceeds <br />$200,000 as estimated by the consultant. <br /> <br />. <br /> <br />Special signage design (sign construction details will be provided however, if specific <br />direction is provided by the City). <br /> <br />SCHEDULE: <br /> <br />Consultant contract finalized and delivered <br /> <br />November 20. 2000 <br /> <br />Pre-design meeting <br /> <br />week of November 27 <br /> <br />Topographic surveys and mapping <br /> <br />month of December <br /> <br />35% plans & specifications submittal <br /> <br />January, 2001 <br /> <br />ARC presentation and review <br /> <br />early February <br /> <br />90% plans & specifications submittal <br /> <br />late February <br /> <br />100% plans & specifications submittal <br /> <br />March 15, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.